TITLE: 10/09 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: None
SHIFT SUMMARY:
IFO is in COMMISSIONING and FIND_IR
Overall a good shift where Louis and Elenna outlined the steps that worked to get to RESONANCE - alog 92254.
Instructions after they left were to run an initial alignment, which I did. I had some initial troubles with MICH_DARK since my first adjustment of the BS was not enough. After figuring that out, I was able to get all the way through. By this time, Louis came back on at around ENGAGE_DRMI_ASC and took over.
One weird thing is that the power would auto-jump to 10W after SRC_ALIGN was being offloaded. I may have clicked the LOWER_POWER guardian when we were stuck at 10W after MICH to see if it would go down to 2W (instead of going to the LASER_PWR guardian, but it doesn't seem to have worked and may have fudged the state ordering). Either way, SRC did actually offload. So after that, I set PWR back to 2W and started locking. This was fully auto.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 15:39 | TCS | Camilla | LVEA | YES | Looking for optic | 15:55 |
| 16:02 | Camilla | LVEA | YES | Looking for phone | 16:06 | |
| 17:54 | TCS | Camilla, Sophie | CHETAPrepLab | y(local) | CHETA work | 19:26 |
| 18:03 | VAC | Gerardo, Jordan | VACPrepLab | n | Looking for viewports | 18:23 |
| 20:16 | CDS | Dave | CER | YES | Looking for channels | 20:40 |
| 20:39 | TCS | Camilla, Sophie | CHETAPrepLab | y(local) | CHETA work | 22:05 |
| 21:36 | Richard | EX,EY | n | Looking for phone numbers | 22:07 | |
| 22:08 | OMC | Keita, Alex | LVEA | YES | OMC measurements | 22:18 |
| 23:05 | TCS | Camilla, Sophie | LVEA | YES | Turning on CHETA laser | 23:55 |
| 23:06 | PCAL | Tony | PCalLab | y(local) | Setting up PCAL measurement | 23:59 |