Reports until 16:32, Monday 12 October 2026
LHO General
thomas.shaffer@LIGO.ORG - posted 16:32, Monday 12 October 2026 (92277)
Ops Day Shift End

TITLE: 10/12 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Oli
SHIFT SUMMARY: Locking up to where the commissioners have been having trouble has been very repeatable and straight forward. Initial alignment right now had ALSY DOF 3 P very slowly going unstable. Handing this off to Oli and Elenna, sorry!

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:16 FAC Kim Opt lab n Tech clean 15:25
16:11 TCS Camilla, Sophie, Miriam LVEA YES CHETA Y work 17:31
17:57 TCS Sophie, Miriam Prep lab YES CHETA prep 18:30
18:16 TCS Camilla Vac prep n checking on things 18:30
19:06 TCS Camilla VacPrepLab n CHETA viewport inspection 19:28
19:42 - Fellows X arm n Afternoon stroll 20:08
19:53 TCS Sophie, Miriam Prep lab YES CHETA prep (Miriam out from 2058-2212) 00:18
20:02 ISC Louis LVEA yes PSL racks swapping CARM cable 20:22
21:02 TCS Camilla CHETALab,VacPrepLab y(local) CHETA work 22:04
23:19 TCS Camilla Prep lab YES Joining the CHETAs 00:19