Displaying report 1-1 of 1.
Reports until 12:04, Tuesday 13 October 2026
H1 CDS (SEI)
filiberto.clara@LIGO.ORG - posted 12:04, Tuesday 13 October 2026 (92293)
EX HEPI Control Panel

WP 13697

To mitigate the HEPI VFD going down during power glitches, a line/load reactor was installed at EX. HEPI was taken offline and breaker was LOTO. AC power to the VFD controller was routed through the load reactor.

Part Number: KDRAA28H2

Images attached to this report
Displaying report 1-1 of 1.