Miriam, Camilla, Sophie
Update on progress on the table in the LVEA:
- We have check the alignment with visible and QCL lasers through alignment appertures and with small adjustments they appear coaligned.
- Removed QPD lens which was put in beam path for practise with the QCL and thermal camera
- Moved 2 sections of laser curtains from HAM1 (check with camilla) to the ITMY CHETA table. We need to get more sections but are waiting for a break in comissioning.
- Added 2 mirrors just before output to the vacuum tube to reflect the beam back along the table and in the furture down the LVEA to measure QCL beam size at a larger distance.
- Fixed flipper/beckhoff integration issues. IO1 was set to be the readout and IO2 the output. IO2 was changed from activation with button to activated with High/low state change on the thorlabs kinetic software.
- Added wall padding for all of the walls of the enclosure
note: The 5V, 12V, 15V power supplies mounted on the din rail and there cables have been tested and are now working. Pin1 and pin2 on the cable to the fan had to be switched as the postive and negative were swapped in the cable from the power supply.