TITLE: 10/14 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 10mph Gusts, 5mph 3min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.20 μm/s
QUICK SUMMARY:
H1 is currently Aquiring_DRMI_1F.
The commissioning team is back at it again sittign in RESONANCE [410] coming up with a game plan to get to CARM_to_Analog [420] without a lockloss.
VAC team went to investigate CP3 fill line.
NUC 30 will be down for a while so I can swap it's hard drive and re-image it.