H1 General
ryan.crouch@LIGO.ORG - posted 16:32, Thursday 15 October 2026 (92318)
OPS Thursday Day shift summary

TITLE: 10/15 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Ryan S
SHIFT SUMMARY: Commissioners worked on ASC loops and CARM, the IFO can relock up to DRMI pretty quickly with its current alignment.
LOG:

Start Time System Name Location Lazer_Haz Task Time End
16:35 TCS Camilla, Miriam LVEA Y Move CHETA-Y barrier 16:48
17:51 CAL Tony, Caroline PCAL lab LOCAL TSK measurement setup 18:20
20:21   Mallika, Alex, Rachel EndX N Walking 20:44
21:03 TCS Camilla CER Y Grab headsets 21:08
21:22 TCS Camilla, Sophie, Miriam LVEA Y CHETA-Y laser measurements Ongoing
23:02 CAL Tony, Fil EndX N Check on PCAL power supply and Chassis Ongoing