SHIFT SUMMARY: We held in DOWN, and with the IMC offline for a bit to investigate the NPRO, Sheila and Daniel increased the IMC diode power x2 and reduced gains, then we resumed locking. The microseism has turned around.
LOG:
| Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
|---|---|---|---|---|---|---|
| 16:29 | FAC | Mitch | LVEA | Y | Clean room inspections, biergarten check | 17:26 |
| 18:23 | FAC | Matt, Kim | MidY | N | Checkout new building | 18:46 |
| 18:59 | TCS | Camilla, Miriam | CHETA lab | LOCAL | CHETA work, Miriam in at 19:04 | 20:08 |
| 19:40 | PSL | Sheila, Daniel | LVEA | Y | IOT2L IMC diode power increase, Daniel out 20:00 | 20:01 |
| 19:49 | Mallika, Alex | Xarm | N | Walkin' | 20:13 | |
| 21:27 | TCS | Camilla, Miriam | CHETA lab | LOCAL | CHETA work | 23:12 |
| 21:50 | PSL | Sheila | LVEA | Y | SR75 PSL racks | 22:12 |