TITLE: 10/16 Eve Shift: 2330-0500 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Commissioning
OUTGOING OPERATOR: Ryan C
CURRENT ENVIRONMENT:
SEI_ENV state: CALM
Wind: 6mph Gusts, 3mph 3min avg
Primary useism: 0.02 μm/s
Secondary useism: 0.30 μm/s
QUICK SUMMARY:
H1 was held in down while Sheila worked on IMC which was held offline.
When we were ready we started locking.
Held lock in Acquire DRMI while touching up SRM.
Went up to CARM_TO_TR, before a lockloss.
I took NUC30 down to re-image it.