Reports until 20:54, Monday 13 January 2014
H1 ISC
kiwamu.izumi@LIGO.ORG - posted 20:54, Monday 13 January 2014 (9253)
corner locking today: L2P on M1 stage of PRM and PR2 adjusted, PRM crossover measured, BS length actuator looks OK.

[Stefan, Kiwamu]

We are now in the process of checking/adjusting the suspensions as our length actuators.

One thing I am confused at this moment is the length transfer function of PRM and PR2. I did the same TF measurement as for the BS length drive for comparison, and found that the TF were 1/f above 10 Hz rather than 1/f^2 (see the attached). There must be some stupid reason because otherwise we wouldn't be able to lock PRX or PRY. I will revisit this issue tomorrow.

Images attached to this report