Towsen Electric on site for lightning protection inspection Snow King working on LSB water system Tumbleweed bailing on X-Arm and at OSB 08:00 Sheila - LVEA working at HAM1/HAM2 area 09:00 Betsy - LVEA hunting for parts 09:27 Kiwamu -Installing rotational stage in H1-PSL enclosure 09:30 John, Richard, & Towsen Electric - LVEA roof lightning protection inspection 10:20 Richard - H1-PSL enclosure on rotational stage 12:30 Vern & Patrick - CER and at HAM1; power recycle EtherCAT chassis #1 in H1-PSL 13:02 Dave – Working in CER 13:17 Kiwamu – Installing rotational stage in H1-PSL enclosure 13:40 Filiberto & Frank – Pulling cable at End-X 13:44 Andres – Installing new EQ stops on H1-SR2 15:00 Safety meeting