Mitchell & I departed the LVEA ~1650pst
With the model changes Hugo did for the ISI we were able to confirm all the sensors we have installed. Haven't run Spectra but the look reasonable for now. We dressed & secured cables, installed cable brackets and took a stab a preliminary balancing.
To do--Install Table extension (Or should we test w & w/o?)
Fine tune balance, float HEPI & level locked ISI--it already is pretty close, only 27mils tilt across the table. Revisit balance, maybe adjust lockers.
Validate ISI.
IAS