(Corey, Eric, Jim, Mike V.)
BSCISI #2
Much of today consisted of dealing with large plates. Basically all the remaining plates for the #2 Assy were brought down from the VPW to the Staging Bldg (this involved lots of shufflin' & flippin').
The top facing & bottom facing plates of the Optics Table were torqued together. The Optics Table was then connected to Stage0 (note, the Stage0 Blade Post bolts still need to be torqued [waiting on a wrench]).
Work will now begin on assembling Walls for Stage1, and helicoiling/dowel pinning to the Stage1 Floor and Stage2 Mid-plate.
Subassemblies
(1) Stage0-1 Flexure was assembled.