Reports until 02:49, Friday 17 June 2011
X1 SEI
corey.gray@LIGO.ORG - posted 02:49, Friday 17 June 2011 (937)
BSC ISI Assembly Status

(Corey, Eric, Jim, Mike V.)

BSCISI #2

Much of today consisted of dealing with large plates.  Basically all the remaining plates for the #2 Assy were brought down from the VPW to the Staging Bldg  (this involved lots of shufflin' & flippin').

The top facing & bottom facing plates of the Optics Table were torqued together.  The Optics Table was then connected to Stage0 (note, the Stage0 Blade Post bolts still need to be torqued [waiting on a wrench]).

Work will now begin on assembling Walls for Stage1, and helicoiling/dowel pinning to the Stage1 Floor and Stage2 Mid-plate.

Subassemblies

(1) Stage0-1 Flexure was assembled.