The BS Y2Y coupling measurement finished and was saved in controls/sballmer/20140115/BSTFdata/BSTFyaw.xml The PRM P2P coupling measurement finished and was saved in controls/kizumi/binary_stars/20140116_PRMdiag/PRM_P2P.xml The PRM Y2Y coupling measurement was started. It is now at 0.7Hz and running. It was temporarily saved in controls/kizumi/binary_stars/20140116_PRMdiag/PRM_Y2Y.xml