gerardo.moreno@LIGO.ORG - posted 16:30, Tuesday 21 January 2014 (9407)
Ops Summary

- 9:05 am, Corey to LVEA West bay, assembly/search for cables.
- 9:13 am, Jim and Adrien to LVEA, work around HAM4.
- 9:29 am, Corey out of the LVEA.
- 9:33 am, Patrick to Mid-Y, retrieve Beckoff chassis for test stand.
- 9:39 am, Mitchell to LVEA, joining Jim and Adrien.
- 9:45 am, Corey to End-Y, cable work.
- 10:11 am, Cyrus and Jim, control room, work per WP#4404.
- 10:16 am, vendor delivery, water.
- 10:16 am, Patrick back from Mid-Y.
- 10:51 am, Kyle to LVEA, x-beam manifold turbo pump work.
- 10:59 am, Mitchell out of LVEA, Jim and Adrien remain inside.
- 11:10 am, Kyle out of LVEA.
- 11:46 am, Jim and Adrien out of the LVEA.
- 12:31 pm, Jeff L. to LVEA, take a load of OFI components and inventory components in the west bay area.
- 12:37 pm, Filiberto to End-X, ISC rack, cable work.
- 1:00 pm, Praxair LN2 delivery, to X-end CP8.
- 2:00 pm, David to control room, work per WP#4405.
- 2:07 pm, David to control room, DAQ restart.
- 2:20 pm, Filiberto out of End-X.
- 2:41 pm, Kyle to the LVEA, turbo-pump by the x-beam manifold.
- 2:54 pm, Sheila to LVEA, ISCT1 to misalign a mirror.
- 2:59 pm, Sheila out of the LVEA.
- 3:05 pm, Jeff L. out of the LVEA.
- 3:50 pm, Jeff L. to the LVEA, inventory OFI components at west bay area.