Soft closed gate valve #7 to install beam dump on top of HAM2, 4:10 pm.
Opened gate valve #7 at 5:05 pm.
(Kiwamu, Stefan, Gerardo)
Attempted to install temporary beam dump on top of HAM2, but it turns out that the modified viewport protector is not the right one. Procedure was stopped until correct part is obtained. Viewport was restored to previous state.
(Kyle, Gerardo)
Soft closed gate valve #7 to install beam dump on top of HAM2, 4:10 pm.
Opened gate valve #7 at 5:05 pm.
(Kiwamu, Stefan, Gerardo)
Attempted to install temporary beam dump on top of HAM2, but it turns out that the modified viewport protector is not the right one. Procedure was stopped until correct part is obtained. Viewport was restored to previous state.