corey.gray@LIGO.ORG - posted 09:22, Wednesday 22 June 2011 (954)
BSCISI #2 Assembly Status

(Corey, Eric, Jeff, Jim, Mick V.)

Stage2 Work

After part of Stage1 was put on the Optics Table, continued to build up Stage2.  The Mid-Plate was installed, Upper Hex Assembly installed, and then we moved back to Stage1 work....

Stage1 Work

After the Stage2 Mid-Plate/Upper Hex Assembly was installed, the Stage1 Close-out Plate & Close-Out Plate Cover were installed (still need to put in bolts and torque the latter).

Subassembly Status

Misc.

Top-Facing Keel plate was put on the Granite Table (lots of helicoiling for it!)