Reports until 16:00, Wednesday 29 January 2014
H1 General
andres.ramirez@LIGO.ORG - posted 16:00, Wednesday 29 January 2014 - last comment - 07:52, Thursday 30 January 2014(9636)
Ops Shift Summary
8:30–9:00 Going into the LVEA to work on dust monitor – Patrick
9:01      PSL Check List done (noticed the ISS Diffracted Power was                     
          Close to 24% - It should be 5-15%)
9:00–10:30 Water Ground staff on site for water sampling – Hanford
9:27–10:03 Back in the LVEA to swap dust monitor power supply–Patrick                      
9:36-      Starting Initial Alignment of Ham 4 optical table- Hugh
9:41       PSL Check List done (noticed the ISS Diffracted Power was                       
           close to 24% - It should be 5-15%)
9:49–12:06  Working on ACB in LVEA West Bay – Mitchell/Scott
13:05-13:59 Back to work on ACB in LVEA West Bay – Mitchell/Scott
13:10-15:14 Periscope assembly on H2 PSL – Joe
13:46-14:48 Installing Tablecloth bracket on SR2 (LVEA) – Jeff B.
13:50-15:14 Joining Joe for periscope assembly on H2 PSL – Craig/Sam
15:00       Safety Meeting 
Comments related to this report
hugh.radkins@LIGO.ORG - 07:52, Thursday 30 January 2014 (9646)

Left LVEA ~1745