Reports until 11:27, Monday 03 February 2014
H1 CDS (SEI)
david.barker@LIGO.ORG - posted 11:27, Monday 03 February 2014 (9752)
h1seih16 power cycled, investigation of 0.5Hz noise in ham6 ISI CPS
Rich M, Richard, Dave

Between the times 11:11 and 11:22 local I power cycled the h1seih16 front end and IO Chassis as part of the investigation of the intermittent 0.5Hz noise on HAM6 ISI CPS.
The procedure followed was:
in MSR
  Kill all user models and then the IOP model
  remove unit from Dolphin fabric
  power off the CPU from the console
in CER
  power down h1seih16 IO Chassis using front panel switch
  remove 24V power cord for about 15 seconds
  reapply 24V power cord
  power up IO Chassis using front panel switch, verify timing slave start correctly
in MSR
  power up h1seih16 CPU, verify no error on console