9:00 PSL Check List done 9:05-10:24 Going to End X to check QPD amplifier chassis - Filiberto 9:47-11:00 Checking SIS cables (HAM4 LVEA) – Jeff B./Mitchell 9:50-10:15 Vendor delivery on Site (water) 10:15 CDs work (installed a new version of gds and changed default NDS server to h1nds0)- James 10:40- Praxiar LN2 delivery to CP1 11:15-12:15 Installing SR2 cable bracket (HAM4 LVEA)- Jeff B. 12:08 Re-starting ETMX/ITMX models – Arnaud 13:10-15:55Working on ACB in LVEA West Bay – Mitchell/Scott 13:30-14:56 SR2 cable testing (HAM4 LVEA) – Jeff B. 14:10 DAQ restart – Dave 14:20-15:58Computer work at End X – Cyrus 14:30-14:46 Back to BSC2 HEPI (Putting actuator back to “Run mode”)-Hugh 15:45 Transitioning End Y to Laser Safe 15:56 Back from End Y – Betsy/Travis