H1-SR2 Cabling
Kate G., Mitch R., Filiberto C., & Jeff B.

   Mitch and Jeff installed the HSTS and TCS SRS cables to the in-vacuum feed through and ran them up to the ISI table. Kate and Jeff checked for grounds in the suspension quadro-puss cables which are routed through the suspension Weldment. Filiberto and Jeff checked for grounds on the in-air cables from the satellite box to the OSEMs. There are no grounds in the H1-SR2 cabling at this time.
 
   The top two cables (for the M1 level) are reversed at either the feed through or the Table Cable Bracket. I will check and correct this mis-connection in the morning.       