Andres R. & Jeff B. We finished cabling and suspended H1-SR2. The masses appear to be hanging correctly as no BOSEM adjustments were necessary to center the flags. After confirming the 50% light positioning of the BOSEMs, we started the Phase 3A transfer functions.