Reports until 16:00, Friday 07 February 2014
H1 General
andres.ramirez@LIGO.ORG - posted 16:00, Friday 07 February 2014 (9921)
Ops Shift Summary
8:50-9:31 Mirror Mounts work in H2 LAE (LVEA)– R. Savage
8:57-12:00 Going to End X to do documentation work – Luis
9:20      PSL Check List: All the parameters were OK except the FSS Threshold on transmitted photo-detector PD = 0.49V (should be 0.9V)
9:25-9:50 Repair person on site to fix the tractor
9:30-     Going to END Y to do TMS work – Corey/Keita
9:49-12:00 Work on SUS electronics (PUM Chassis) at END X – Filiberto
10:07-10:33 Searching for parts in LVEA – Thomas