8:50-9:31 Mirror Mounts work in H2 LAE (LVEA)– R. Savage 8:57-12:00 Going to End X to do documentation work – Luis 9:20 PSL Check List: All the parameters were OK except the FSS Threshold on transmitted photo-detector PD = 0.49V (should be 0.9V) 9:25-9:50 Repair person on site to fix the tractor 9:30- Going to END Y to do TMS work – Corey/Keita 9:49-12:00 Work on SUS electronics (PUM Chassis) at END X – Filiberto 10:07-10:33 Searching for parts in LVEA – Thomas