After correcting some cabling problems with H1-SR3, we set the open light, offsets, and gains as listed in the table below. The BOSEMs have been centered and set to 50% light. M1 level TFs are running over night to establish the baseline ahead of the glass mass installation. OSEM OL Gain Offset M1T1 20302 1.478 -10151 M1T2 31863 0.942 -15931 M1T3 31528 0.952 -15764 M1LF 23046 1.302 -11523 M1RT 27603 1.087 -13802 M1SD 23250 1.290 -11625 M2UL 25177 1.192 -12589 M2LL 24388 1.230 -12194 M2UR 27146 1.105 -13573 M2LR 25803 1.163 -12901 M3UL 25486 1.177 -12743 M3LL 27961 1.073 -13980 M3UR 25580 1.173 -12790 M3LR 25809 1.162 -12905