Reports until 17:08, Monday 10 February 2014
H1 SUS
jeffrey.bartlett@LIGO.ORG - posted 17:08, Monday 10 February 2014 (9962)
Phase 2a Testing of H1-SR3
	  After correcting some cabling problems with H1-SR3, we set the open light, offsets, and gains as listed in the table below. The BOSEMs have been centered and set to 50% light. M1 level TFs are running over night to establish the baseline ahead of the glass mass installation.

OSEM    OL     Gain  Offset
M1T1   20302 1.478 -10151
M1T2   31863 0.942 -15931   
M1T3   31528 0.952 -15764    
M1LF   23046 1.302 -11523    
M1RT   27603 1.087 -13802    
M1SD   23250 1.290 -11625   

M2UL   25177 1.192 -12589     
M2LL   24388 1.230 -12194    
M2UR   27146 1.105 -13573    
M2LR   25803 1.163 -12901    

M3UL   25486 1.177 -12743
M3LL   27961 1.073 -13980   
M3UR   25580 1.173 -12790   
M3LR   25809 1.162 -12905