Here is a comparison image of the new Accumulator Wet side made in Stainless Steel. They look very nice. Although the shop test fit 100% (they've done 25 of 160) EricA is putting together the first ones now and we'll confirm they are sealing well with N[SIZE=1]2[/SIZE]. We will install these new ones on the remaining three H2 Pumpstations on the mezzanine, the H2 Pump Station at the end station and reserve eight for BSCs 8 & 6 distribution manifolds.