Displaying reports 3341-3360 of 83093.Go to page Start 164 165 166 167 168 169 170 171 172 End
Reports until 10:17, Sunday 05 January 2025
LHO VE
david.barker@LIGO.ORG - posted 10:17, Sunday 05 January 2025 (82124)
Sun CP1 Fill

Sun Jan 05 10:13:05 2025 INFO: Fill completed in 13min 2secs

TCtrip -50C, TCmins [-64, -34] OAT (4C, 38F).

Est. TCA-min was -62.

Images attached to this report
H1 General (Lockloss)
oli.patane@LIGO.ORG - posted 09:39, Sunday 05 January 2025 - last comment - 11:33, Sunday 05 January 2025(82123)
Lockloss

Lockloss @ 01/05 17:37 UTC due to earthquake

Waiting for earth to calm down before trying to relock.

Comments related to this report
oli.patane@LIGO.ORG - 11:33, Sunday 05 January 2025 (82125)

19:32 Observing

H1 General
oli.patane@LIGO.ORG - posted 07:38, Sunday 05 January 2025 - last comment - 08:39, Sunday 05 January 2025(82121)
Ops Day Shift Start

TITLE: 01/05 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 4mph Gusts, 2mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.38 μm/s
QUICK SUMMARY:

Currently relocking and at FIND_IR. We had been locked for 14.5 hours before having a lockloss a bit ago at 01/05 15:17UTC

Comments related to this report
oli.patane@LIGO.ORG - 08:39, Sunday 05 January 2025 (82122)

16:38 UTC Back to Observing

H1 General (SQZ)
ryan.crouch@LIGO.ORG - posted 22:00, Saturday 04 January 2025 - last comment - 08:43, Monday 06 January 2025(82117)
OPS Saturday eve shift summary

TITLE: 01/05 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Observing at 158Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: We've been locked for over 5 hours.
LOG: No log

"pump fiber rej power in ham7 high, align fiber pol on sqt0" notification on SQZ_OPO_LR

00:46 UTC observing

Comments related to this report
camilla.compton@LIGO.ORG - 08:43, Monday 06 January 2025 (82132)

Reduced the pump rejected power H1:SQZ-SHG_FIBR_REJECTED_DC_POWER: using the two pico waveplates on the SQZT0 SHG to OPO path H1:SYS-MOTION_C_PICO_I_MOTOR_3_{X/Y}_POSITION, scope on SQZT0 "! fiber pol".  Reduced SHG_FIBR_REJECTED from 0.4 to 0.03mW. 

Images attached to this comment
H1 General
oli.patane@LIGO.ORG - posted 16:35, Saturday 04 January 2025 (82119)
Ops Day Shift End

TITLE: 01/05 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Ryan C
SHIFT SUMMARY: Currently relocking and at MAX_POWER. Most of today we were Locked and Observing, but this one lockloss so far hasn't been too bad to relock from. Only issue I had was that ALSY took forever to lock and I ended up having to adjust it manually just a couple of steps.
LOG:

19:30 Dropped Observing and went to NLN_CAL_MEAS for calibration measurements
20:04 Back to NLN and Observing

22:50 Lockloss
    - I had to touch ALSY because it couldn't lock after 30 minutes of trying, even with SCAN_ALIGNMENT. Just needed to be adjusted a tiny bit in P
    - Ran an initial alignment
    - Continued relocking

 

LHO FMCS
ryan.crouch@LIGO.ORG - posted 16:10, Saturday 04 January 2025 (82116)
HVAC Fan Vibrometers FAMIS Check

Closes FAMIS 26351, last checked in alog82033

Nothing of note on the outbuildings or CS fans.

Images attached to this report
H1 General
ryan.crouch@LIGO.ORG - posted 16:03, Saturday 04 January 2025 - last comment - 16:28, Saturday 04 January 2025(82115)
OPS Saturday EVE shift start

TITLE: 01/05 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Oli
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 4mph Gusts, 2mph 3min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.36 μm/s
QUICK SUMMARY:

Comments related to this report
ryan.crouch@LIGO.ORG - 16:28, Saturday 04 January 2025 (82118)SQZ

"pump fiber rej power in ham7 high, align fiber pol on sqt0" notification on SQZ_OPO_LR

H1 General (Lockloss)
oli.patane@LIGO.ORG - posted 14:51, Saturday 04 January 2025 - last comment - 16:48, Saturday 04 January 2025(82114)
Lockloss

Lockloss @ 01/04/25 22:50 UTC after 18.5 hours locked. Not sure of the cause yet.

Comments related to this report
ryan.crouch@LIGO.ORG - 16:48, Saturday 04 January 2025 (82120)

00:46 UTC Observing

H1 General
oli.patane@LIGO.ORG - posted 14:08, Saturday 04 January 2025 (82113)
Ops Day Midshift Update

Currently Observing at 161 Mpc and have been Locked for almost 18 hours. Nothing to note.

H1 CAL
oli.patane@LIGO.ORG - posted 12:05, Saturday 04 January 2025 (82112)
Calibration Measurements January 04, 2025

Calibration measurements taken during the regular Saturday calibration time. We had been locked for over 15 hours at the time of starting the measurements.

Calibration monitor screen

Broadband (01/04/2025 19:32:45 - 19:38:06 UTC)

../PCALY2DARM_BB/PCALY2DARM_BB_20250104T193245Z.xml

Simulines (01/04/2025 19:40:14 - 20:03:20 UTC)

../DARMOLG_SS/DARMOLG_SS_20250104T194014Z.hdf5
../PCALY2DARM_SS/PCALY2DARM_SS_20250104T194014Z.hdf5
../SUSETMX_L1_SS/SUSETMX_L1_SS_20250104T194014Z.hdf5
../SUSETMX_L2_SS/SUSETMX_L2_SS_20250104T194014Z.hdf5
../SUSETMX_L3_SS/SUSETMX_L3_SS_20250104T194014Z.hdf5

Images attached to this report
LHO VE
david.barker@LIGO.ORG - posted 10:25, Saturday 04 January 2025 (82111)
Sat CP1 Fill, manual cancel

Sat Jan 04 10:19:24 2025 ALERT: Fill done (errors) in 19min 20sec

TC-A started high again (+25C) and didn't quite reach the -60C trip, it flatlined at -58C, so I manually cancelled the fill. Discharge line pressure suggests it was a good fill.

OAT (-0.6C, 31F)

Trip has been increased to -50C for tomorrow's fill.

 

Images attached to this report
H1 General
oli.patane@LIGO.ORG - posted 07:39, Saturday 04 January 2025 - last comment - 07:42, Saturday 04 January 2025(82108)
Ops Day Shift Start

TITLE: 01/04 Day Shift: 1530-0030 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Observing at 157Mpc
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 0mph Gusts, 0mph 3min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.43 μm/s
QUICK SUMMARY:

Currently Observing and have been Locked for 11.5 hours. Secondary microseism is high at the 90th percentile but holding steady, and wind is low. Super foggy and icy outside on the roads out here and there's snow on Laliik (Rattlesnake Mountain)!

Comments related to this report
oli.patane@LIGO.ORG - 07:39, Saturday 04 January 2025 (82109)

15:38 UTC Just dropped out of Observing due to the SQZer unlocking

oli.patane@LIGO.ORG - 07:42, Saturday 04 January 2025 (82110)

15:42 UTC Back to Observing - SQZer relocked by itself

H1 General (SEI)
ryan.crouch@LIGO.ORG - posted 22:00, Friday 03 January 2025 (82106)
OPS Friday EVE shift summary

TITLE: 01/04 Eve Shift: 0030-0600 UTC (1630-2200 PST), all times posted in UTC
STATE of H1: Observing at 162Mpc
INCOMING OPERATOR: TJ
SHIFT SUMMARY: 1 lockloss from an earthquake, easy re-lock.
LOG: No log.

We've been locked for almost 2 hours, we lost the long lock to an earthquake.  Relocking was straight forward but took longer due to the high 2ndary motion.

Images attached to this report
H1 General (Lockloss)
ryan.crouch@LIGO.ORG - posted 18:16, Friday 03 January 2025 - last comment - 20:23, Friday 03 January 2025(82105)
02:15 UTC lockloss

02:15 UTC lockloss, likely due to a 5.8 from Ethiopia.

Comments related to this report
ryan.crouch@LIGO.ORG - 20:23, Friday 03 January 2025 (82107)

04:21 UTC Observing

Displaying reports 3341-3360 of 83093.Go to page Start 164 165 166 167 168 169 170 171 172 End