Reports until 08:18, Thursday 14 November 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 08:18, Thursday 14 November 2019 (53239)
Ops Day Shift Transition
Ops Shift Transition: 11/14/2019, Day Shift 16:00 – 00:00 (08:00 -16:00) - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Observing
Weather:  Skies are cloudy. The winds are Calm. Temperatures are currently in the upper 30s with highs expected to be in the 50s.   
Primary 0.03 – 0.1Hz: 0.02um/s
Secondary 0.1 – 0.3Hz: 0.5um/s (Elevated due to weather front moving in from the Pacific).
Outgoing Operator: Corey
Quick Summary: The IFO is locked and Observing for the past 6 hours. The range is around 96.0Mpc. Heavy trucks and equipment for wind fence installation are on site. No other issues or concerns at this time.    
LHO General
corey.gray@LIGO.ORG - posted 08:02, Thursday 14 November 2019 - last comment - 06:19, Friday 15 November 2019(53234)
OWL Operator Summary

TITLE: 11/14 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 118Mpc
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:

Nice shift with an even nicer lock acquisition with H1 locking on its first attempt (with only a little bit of help at the beginning!).

But now things are a rumblin' at BOTH end stations for Wind Fence work---I'm gonna sneak out quick before H1 breaks lock!
LOG:

Comments related to this report
ronaldas.macas@LIGO.ORG - 06:19, Friday 15 November 2019 (53268)

Hi Corey. I am on the DQ shift for Hanford this week. Could you explain a bit more what happened between 9:01 - 9:03, why has the detector lost lock? Just want to understand if I need to follow this up, thanks!

H1 CDS (CDS, SUS)
corey.gray@LIGO.ORG - posted 06:11, Thursday 14 November 2019 - last comment - 08:31, Thursday 14 November 2019(53238)
H1IOPSUSAUXB123 Has ADC Error

Happened to notice red on the CDS Overview & it looks like at 9:16utc H1IOPSUSAUXB123 went into an ADC Error state.  (this was 10+min after my lockloss)

Images attached to this report
Comments related to this report
david.barker@LIGO.ORG - 08:31, Thursday 14 November 2019 (53240)

I took a look at dmesg and /proc/h1iopsusauxb123/status, could not find anything remarkable about this event. I'll clear the ADC bit next time we are out of observe.

 

Images attached to this comment
LHO General
corey.gray@LIGO.ORG - posted 04:04, Thursday 14 November 2019 (53237)
Mid Shift Status

H1 locked over 1.75hrs.  After being out of Observing for 69min for a lockloss, H1 is running well with SUS violins looking fine so far.  Microseism continues to increase as winds have decreased.

H1 General
corey.gray@LIGO.ORG - posted 02:17, Thursday 14 November 2019 (53236)
Back To Observing On First Lock Attempt!

Summary:  Back to Observing with 1st lock, and only needed intervention for:  x & y green arms & Finding IR.

H1 SUS
corey.gray@LIGO.ORG - posted 01:27, Thursday 14 November 2019 (53235)
Out Of Observing For Violins....But Then Had Lockloss

9:01 Out of OBSERVING to address ETMy violin mode (notified LLO & Virgo)

I was only looking at ETMy at the time of lockloss, so not sure if this was the reason for the lockloss...I thought we could make gain changes and have time to watch it in case other modes were rung up.  At any rate, we had a lockloss while I was trying to actively damp a violin mode.

I moved on to locking and assumed DOWN state would take care of anything needed for Violins.

Images attached to this report
LHO General
corey.gray@LIGO.ORG - posted 00:33, Thursday 14 November 2019 (53233)
Transition to OWL Log

TITLE: 11/14 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 114Mpc
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_CONF state: WINDY
    Wind: 17mph Gusts, 10mph 5min avg
    Primary useism: 0.07 μm/s
    Secondary useism: 0.38 μm/s

Microseism appears to be inching up over last few (~8) hrs.
QUICK SUMMARY:

H1 locked for almost 8.75hrs.  TJ noticed ETMy MODE 2 violin ringing up (DARM on the wall as the Fundamental line above reference & below 10^-16).  So I'm going to review procedure for damping this down and figure out if/when I should take action (we are currently in the middle of Triple Coincidence.  We have been fairly glitchy in the last 90min...wonder if that's the reason and this warrants action to be taken sooner rather than later.

LHO General
thomas.shaffer@LIGO.ORG - posted 00:09, Thursday 14 November 2019 (53229)
Ops Eve Shift Summary

TITLE: 11/14 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 114Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: After the wind fence crew was done, it was smooth sailing the rest of my shift.
LOG:

H1 General
thomas.shaffer@LIGO.ORG - posted 20:22, Wednesday 13 November 2019 (53232)
Ops Mid Shift Report

Locked for 4.5 hours. The range is down slightly (112Mpc) from normal, most likely from high useism and some light wind.

H1 CAL (CAL)
timesh.mistry@LIGO.ORG - posted 18:59, Wednesday 13 November 2019 - last comment - 19:34, Wednesday 13 November 2019(53230)
NCAL Update -- First Signal in DARM!

[Jeff Kissel, Filiberto Clara, Patrick Thomas, NCAL Team, Timesh Mistry, Krishna Venkateswara (in spirit)]

We spun the Newtonian Calibrator Prototype and observed the first NCAL signal in DARM!

Initially, we werre still having power issues however, Fil noticed that the negative cable for the AC power was not connected correctly and fixed the issue. Once completed, there were no more power errors and we were able to activate the motor using the MEDM screen. As part of Fil's fix, we now have a DC power supply that is running next to the Beckhoff rack where the motor controller is installed (same place as the BRS Beckhoff rack). This power supply will remain powered after we leave the X-End and may cause some exess noise at the X end. This will be rectified next Tueday maintenace as well as tiding up the remaning NCAL wiring.

We drove the NCAL at two frequencies (6.14Hz and 6.34Hz) using the MEDM/EPICS interface and, at each frequency we used PCALY to drive lines close to NCAL 2f and 3f lines. We chose PCALY becuase we wanted to have an isolated reference line near the NCAL line (recall the NCAL is at the X end). We kept and eye on the PCALY to ensure we were not saturating the PCAL as well as monitering the power supply at the X end to ensure we were not drawing too much current. Thoughout the tests, we did not saturate the PCAL or trip the power supply.

NCAL at 6.14Hz without PCALY
NCAL at 6.14Hz with PCALY
NCAL at 6.34Hz with PCALY
NCAL at 6.34Hz without PCALY

The dotted blue lines show the 2f and 3f NCAL signals respectivetly. It is interesting that we do not see the any higher order harmonics, such as 4f, 5f, 6f etc. It is currenlty inknown the impact the NCAL is having in other auxhillary channels and this will be investigated further.


Time Log of X End Activities

13:42:15

The velolcity counts to the NCAL motor is 644 counts. Motor start spinning, the NCAL signals are as follows:

NCAL Harmonic Expected Frequency (Hz)
1f 6.14
2f 12.28
3f 18.42

13:46:00

NCAL reached the requested frequency.

13:52:20

PCALY lines are enabled and configured to have a line close to the 2f and 3F NCAL signal.

PCALY Frequency (Hz) PCALY Counts
12.17 100
18.51 100

14:00:00

Switched NCAL frequency to 655 counts.

NCAL Harmonic NCAL Frequency
1f 6.3419
2f 12.683
3f 19.025

14:00:20

New frequency reached.

14:01:40

PCAL lines switched to new frequency.

PCALY Frequency PCALY counts
12.61 100
18.83 100

14:15:00

PCALY lines turned off. NCAL remains at 655 counts.

14:30:00

NCAL set to 0 counts.

14:31:07

NCAL is at rest verified using traces on the MEDM screen showing 0 for the torque and the motor velocity and there are not more signals in DARM.

14:32:00

Power to the motor is disabled.

14:35:00

Left the X end. Wifi off, Phone unplugged and lights off.

 

 

Images attached to this report
Comments related to this report
jenne.driggers@LIGO.ORG - 19:34, Wednesday 13 November 2019 (53231)

So cool! 

H1 SEI (PEM, SYS)
hugh.radkins@LIGO.ORG - posted 16:40, Wednesday 13 November 2019 (53228)
WindFence Build Update--EX ready for concrete--EY waiting for Crane

The EndX poles and collars are set and ready for the concrete which likely will happen tomorrow.  The crane remains flakey and a technician is working on it now.

Concrete delivery is currently planned for 11a tomorrow and hopefully the poles will go in with a rejuvenated crane and keep ahead of the concrete.  Attached are some photos: 1) Crane troubleshooting; 2) Rebar build in the collar; 3) The EndX Pole Line.

Images attached to this report
LHO General
thomas.shaffer@LIGO.ORG - posted 16:08, Wednesday 13 November 2019 (53227)
Ops Eve Shift Transition

TITLE: 11/14 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 112Mpc
OUTGOING OPERATOR: Jeff
CURRENT ENVIRONMENT:
    SEI_CONF state: WINDY
    Wind: 13mph Gusts, 9mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.26 μm/s
QUICK SUMMARY: There is still some large equipment moving to its parking spot for the evening, but once it gets there we should be quiet on site.

H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:00, Wednesday 13 November 2019 (53226)
Ops Day Shift Summary
Ops Shift Log: 11/13/2019, Day Shift 1600 – 00:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN
Intent Bit: O
Support: N/A
Incoming Operator: TJ
Shift Summary: IFO lost lock in the first part of the shift. Auto recovery worked, but with a bit of operator intervention. The afternoon was given over to the commissioning team.
There was one GRB alert, which came while we were in Commissioning Mode. It was ignored.
The wind fence crew is moving from End-X to End-Y   
 
Activity Log: Time - UTC (PT)
16:00 (08:00) Take over from Corey
16:39 (08:39) Switch to EARTHQUAKE for mag5.4 from El Salvador
16:46 (08:46) Lockloss – Unknown
16:53 (08:53) Vlad – Going in and out Optics Lab
16:56 (08:56) Hugh – Going to End-X to check on wind fence installation
17:20 (09:20) Hugh – Escorting Net Services to End-Y to deliver Man Lift
                                  Net Services delivering a second Man Lift to End-X
17:35 (09:35) Karen – Going to the Wood Shop and Pump Room
17:43 (09:43) Net Services truck leaving End-Y
17:59 (09:59) Net Services Truck leaving End-X
*** Crane work at both ends all day
18:27 (10:27) Karen – Finished at Wood Shop and Pump Room
18:46 (10:46) Relocked and NLN and back into Observing
20:57 (12:57) Drop out of Observing for afternoon commissioning
20:59 (12:59) Sheila & Daniel – Going into LVEA to the Squeezer area
21:05 (13:05) Timesh, Filiberto, & Jeff K., - Going to End-X for NCal work
21:43 (13:43) Fermi GRB Alert - #E354541 latency and TD good,
                       IFO in Commissioning, LLO down - Ignored alert  
22:00 (14:00) Sheila & Daniel – Out of the LVEA
22:09 (14:09) Jeff K. – Leaving End-X
22:35 (14:35) Timesh – Back from End-X
22:47 (14:47) Rick & Suresh – Into the Optics Lab
22:48 (14:48) Gerardo – Going to Mid-X
23:37 (15:37) Hugh – Going to End-X to check on wind fence installation
00:00 (16:00) Turn over to TJ
H1 PSL
camilla.compton@LIGO.ORG - posted 13:32, Wednesday 13 November 2019 (53224)
Weekly PSL Chiller Reservoir Top-Off

FAMIS task 10535

120ml added to Crystal Chiller 

H1 General
jeffrey.bartlett@LIGO.ORG - posted 12:17, Wednesday 13 November 2019 (53223)
Ops Day Mid-Shift Summary
   Lock loss at the start of the shift. Did auto-relocking, which only need a little operator intervention with ALS-Y. Relocked and back to NLN after 2 hours of trying. (see aLOG #53222). 

   There is heavy equipment work on the wind fence at End-X. This equipment and work will relocate to End-Y this afternoon.

   The wind and general environmental conditions are good. No other issues or problems noted at this time. 

   The range is around 116.9Mpc. 

   There is three hours commissioning work scheduled for this afternoon, between 21:00 (13:00) and 00:00 (16:00).   
H1 General
jeffrey.bartlett@LIGO.ORG - posted 11:40, Wednesday 13 November 2019 (53222)
Relocking after Lockloss
   Lost lock at 16:46 (08:46) At the time there was (1) incoming earthquake mag5.4 from El Salvador , SEI_CONF was in EARTHQUAKE state, (2) There was a bit of wind, and (3) There was activity with the wind fence installation. Not to say that these caused the lock loss. 

   Relocking Summary: 

   After 5 minutes ALS-Y had not locked. 
   Put ALS-Y Guardian into unlocked. Camilla moved Yaw from -135.3 to -135.5 and Pitch from 119.8 to 120.1. The signal jumped up to around 0.8. Switch back to OFFLOAD ALS-Y and WFS took it the rest of the way up. 

   At DRMI_1F, spot did not look so good. Started trying to lock DRMI at 17:05 (09:05). It dropped back to PRMI_LOCKING twice. DRMI_1F locked on the third try with 3 minutes left on the 20 minute countdown clock. 

   17:29 (09:29) - Lock loss at ENGAGE_ASC_FOR_FULL_IFO. 

The run up back to ENGAGE_ASC_FOR_FULL_IFO went smoothly with no operator intervention.

   17:44 (09:44) - Lock loss at ENGAGE_ASC_FOR_FULL_IFO. 

The run up back to ENGAGE_ASC_FOR_FULL_IFO went smoothly with no operator intervention.

   18:01 (10:01) - Lock loss at INCREASE_POWER

Jennie was working on Input Limitations ADS at the time

Relocking went well with Jennie and Camilla doing some hand tweaking (aLOG 53220)

   18:46 (10:46) Back to NLN and into Observing - No SDF Diffs to address. 

    
H1 SEI (PEM, SYS)
hugh.radkins@LIGO.ORG - posted 11:11, Wednesday 13 November 2019 (53221)
Wind Fence build Update--Ongoing

They got the crane functioning again; maybe it needed a reboot...  Just like my computer which wouldn't open the photos last night.  Now they open.  Find attached photos of 1) The base of an EndX pole: 16"Φ with a 4" drain hole. 2) Pole in hole with wedges for holding position.  3) EndX line of poles at end of day Tuesday.  4) Base of EndY pole: 20"Φ with drain hole.

They'll be done setting poles soon this morning and continue at Y this afternoon.  May finish this afternoon or in the morning.  Concrete currently scheduled for 10a Thursday.

Images attached to this report
H1 ISC (Lockloss)
jenne.driggers@LIGO.ORG - posted 10:47, Wednesday 13 November 2019 (53220)
Soft limiters on input of ADS during engage ASC for full IFO

[Sheila, Camilla, Jenne]

We've been having several locklosses during Engage_ASC_for_full_IFO lately, and it seems like it might be because the PRM is moving too far too fast.  Recall that the PRM is being controlled by the ADS system, and that is engaged for the PRM during this state, along with a host of other ASC loops.

We have turned on the ADS soft limiters, to limit the inputs to an absolute value of 10 (when the dither line amplitudes were 1600). Also, the engage_ASC_for_full_IFO state was not doing any convergence checking on the PRM loop, so we have implemented that.  Since the smooth limiters are now on, we have also changed the dither_convergence_checker to look just before the input limiter.

We've had 1.5 lock acquisitions with these limiters, and so far it seems good.  The first time around we lost lock during increase power after having survived the ASC engagement, but I highly suspect that was due to me increasing the limits without any ramping, in an effort to speed up the loops (I had at first been using a much smaller limit of 3).  Our second lock has gone quite smoothly. 

Right now, the input limiters are being left on with the limit value of 10, however the dither line amplitudes (and so the input values) are decreased by a factor of 1600/30 (from 1600 to 30 counts), so we're basically never going to hit those limits.  If we feel that we need to keep the limits in play, then we should reduce the limit values also by a factor of 1600/30.

Also, these seem not to be monitored in SDF, so we should consider moving them to being monitored, but since we're already in Observe I'll push that to another day.

H1 AOS
jeffrey.bartlett@LIGO.ORG - posted 08:12, Wednesday 13 November 2019 (53219)
Ops Day Shift Transition
Ops Shift Transition: 11/13/2019, Day Shift 16:00 – 00:00 (08:00 -16:00) - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Observing
Weather:  Skies are mostly cloudy, some small patches of fog. The winds are a Light Breeze. Temperatures are currently in the upper 30s to mid-50s.  
Primary 0.03 – 0.1Hz: 0.01um/s
Secondary 0.1 – 0.3Hz: 0.1um/s
Outgoing Operator: Corey
Quick Summary: The IFO has been observing for about 11 hours. All appears normal at this time.