Reports until 08:01, Wednesday 13 November 2019
LHO General
corey.gray@LIGO.ORG - posted 08:01, Wednesday 13 November 2019 (53217)
OWL Operator Summary

TITLE: 11/13 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 116Mpc
INCOMING OPERATOR: Jeff
SHIFT SUMMARY:

A very quiet & nice shift for H1.  (L1 is out for violin mode damping.)
LOG:

LHO General
corey.gray@LIGO.ORG - posted 03:46, Wednesday 13 November 2019 (53218)
Mid Shift Status

Very quiet shift thus far with H1 locked 10.25hrs & low freq seismic bands flat and quiet.

LHO General
corey.gray@LIGO.ORG - posted 00:17, Wednesday 13 November 2019 (53216)
Transition to OWL Log

TITLE: 11/13 Owl Shift: 08:00-16:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Observing at 113Mpc
OUTGOING OPERATOR: TJ
CURRENT ENVIRONMENT:
    SEI_CONF state: WINDY
    Wind: 6mph Gusts, 3mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.26 μm/s

Environmentally we are looking A-OK.  (Off to heat up gnocchi for breakfast.)
QUICK SUMMARY:

H1's been locked 6.75hrs, and range looks a bit odd (little lower than last lock & a little more up & down, too). 

PRCL Live is different from reference again.

LHO General
thomas.shaffer@LIGO.ORG - posted 00:07, Wednesday 13 November 2019 (53205)
Ops Day Shift Summary

TITLE: 11/13 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 115Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Recovered lock after a few tries getting past the the spot move. Squeezer dropped us out one but relocked quickly. Our range isn't the cleanest, but may be improving.
LOG:

LHO General
thomas.shaffer@LIGO.ORG - posted 20:00, Tuesday 12 November 2019 (53215)
Ops Mid Shift Report

2 hour lock. Our range has been drifting down since the start of the shift, and I haven't found anything that seems out fo the norm. There looks to be some 30-40Hz noise that will very slightly increase from time to time, but I cant confirm that it is the cause.

H1 General
thomas.shaffer@LIGO.ORG - posted 17:36, Tuesday 12 November 2019 (53214)
Observing 0131 UTC

We had some trouble staying stable after going through the spot move, but what seemed to work is waiting after ther soft loops have engaged for everything to settle a bit more. This may mean that we need to set some thresholds a bit tighter.

Violin modes are up a bit, I will keep an eye on them and make sure they are heading down and/or being damped.

H1 CAL (CAL)
timesh.mistry@LIGO.ORG - posted 17:05, Tuesday 12 November 2019 (53203)
NCAL Update -- Cabling the Optical Encoder and Final IAS of the NCAL (WP 8442 and WP 8451)

[Jason, Fil, Dave (remote), Patrick (remote),Timesh]

This is the results from WP 8442 and 8451.

At the X-end, we were able to survey the NCAL. Since the all the covers were on the NCAL, we had to remove the NCAL from its' mount and remove the cover to expose on half of the rotor then reinstall the NCAL onto the mount. This was to expose the NCAL rotor and the punch mark that we use as our reference points. Since the NCAL plate now has slots where the bolts fasten the NCAl to the plate, this means the NCAL can translate either towards or away from the chamber before being bolted down. We decided locate the NCAL as far back as the slots would allow. This ensures we have plenty of clearance between the back of the NCAL and the flange bolts on the vacuum chamber. After surveying the NCAL, we removed the NCAL from the mount once more. During this time, we took the opportunity to check all the bolts were torqued down. We followed the numbers from T1100066-v6 using number under the 'generic SS' column. Once all the bolts were checked, the NCAL cover was bolted on and the NCAL was re-installed onto the mount, torquing the bolts down. We ensured we located the NCAL in the same position as it was surveyed in by moving the NCAL as far back into the slots as possible. I cable-tied the orange power and comms cable to the conduit that runs adjacent to the NCAL, to relieve the stresses on the wight of the cable on the connector. The NCAL is now in its final installed state. The only part that is missing is the MuMetal cover to shield spurious magnetic field from the motor because the mounting fixture for this is not ready yet and should not prevent an inital spin test.

The BNC cable in the EE bay was plugged into the chassis as well as the BNC connected to the grey satellite box in the XVEA. In addition, the power to the grey satellite box was switched on thus, there should now be data available on H1:CAL-NCALX_ENCODER_VELOCITY_DQ.

We were unable to spin the NCAL at the end station using the MEDM screen or directly though the Beckhoff software. When looking at the screen on the motor controller, a 'UnderVoltage(E)' error. With Fils helps this, this was because I forgot to plug in the AC power to the motor controller and I had not brought the cable with me to the end station. Thus, I will wait for an opportunity to enable power to the Beckhoff Motor Controller - which was detailed in LHO alog 53208.

Images attached to this report
H1 SEI (PEM, SYS)
hugh.radkins@LIGO.ORG - posted 16:59, Tuesday 12 November 2019 (53213)
Wind Fence Build activities done for the day

Walked away about 4:20.  We still had light and motivation but after three poles, the boom of the crane refused to tilt down.  It would extend and retract and left & right and cable in and out, and, tilt up, but refused to tilt back down.  Being positioned between a couple holes managed to set one more pole for four placed today.  Without being able to tilt the boom back down, the crane truck is not moving.  Not sure if that is just procedural or if there is a lock out but they have a call into the crane company.

I took some photos and I'll attach them shortly.

LHO General (FMP)
gerardo.moreno@LIGO.ORG - posted 16:58, Tuesday 12 November 2019 (53212)
HAM5/6 Scaffolding Removal

(Tyler G, Chris S, Gavin W, Jim W, Gerardo M)

After Jim locked HEPI for both HAM5 and 6, the scaffolding was removed without incident.

Scaffolding components were stacked on a pallet, which was put away inside the large equipment access bay.

H1 CDS (DAQ)
david.barker@LIGO.ORG - posted 16:55, Tuesday 12 November 2019 - last comment - 16:57, Tuesday 12 November 2019(53210)
CDS Maintenance: Tuesday 12th November 2019

CAL model and DAQ restart

Vladimir, Sudarshan, Dave:

New h1cale[x,y] models were installed, DAQ was restarted.

DAQ NDS Test Machine installed

Jonathan, Dave:

h1nds2 was installed as a test bed for new daqd code.

This new machine as added to the DAQ MEDM.

Upgrade FOM machines to Debian9

Dave:

nuc4 upgraded to nuc25 (Guardian and DRMI). This permitted the ISC Guardian overview window to resolve correctly.

nuc6 upgraded to nuc29 (ASC control and error). 

 

Comments related to this report
david.barker@LIGO.ORG - 16:57, Tuesday 12 November 2019 (53211)
Images attached to this comment
LHO General
thomas.shaffer@LIGO.ORG - posted 16:33, Tuesday 12 November 2019 (53209)
Ops Day Shift Transition

TITLE: 11/13 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
    SEI_CONF state: WINDY
    Wind: 2mph Gusts, 1mph 5min avg
    Primary useism: 0.02 μm/s
    Secondary useism: 0.28 μm/s
QUICK SUMMARY: Had another lock loss after engaging soft loops as we handed off. We are approaching that spot now, so we shall see if we get it this time.

H1 CAL (CAL)
timesh.mistry@LIGO.ORG - posted 16:29, Tuesday 12 November 2019 (53208)
NCAL Update -- Restarted H1NCALEX PC

At 16:22 (LHO time) I restarted the h1ncalex PC and at 16:24 (LHO time) I restarted the ioc.bat to restart the EPICS.

This is because I had an oppertunisitic time to go to the X end and enable AC power to Beckhoff Motor Controller (see alog in the future with the reason why this needed to be done).

LHO General
patrick.thomas@LIGO.ORG - posted 16:20, Tuesday 12 November 2019 (53207)
Ops Day Shift Summary
TITLE: 11/13 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Camilla, Patrick. TCS Y tripped off and had to be restarted on the floor. Wind fence installation continues after end of maintenance. Currently relocking.
LOG:

16:00 UTC Vanessa to end X
16:01 UTC Tyler, Chris, Gavin to HAM6 to dismantle scaffolding
16:07 UTC Chandra to LVEA WP 8460
16:09 UTC Jeff B. to end, corner mechanical rooms
16:09 UTC Karen to end Y
16:12 UTC Charge measurements started at end X
16:13 UTC Charge measurements started at end Y
16:29 UTC Sudarshan starting WP 8464
16:30 UTC Ken to end Y electronics bay
16:34 UTC Richard and Filiberto replacing 35.5 MHz RF oscillator source
16:46 UTC Jim to HAM5,6 to lock HEPI
16:48 UTC Karen done at end Y
16:51 UTC Richard and Filiberto done
16:52 UTC Filiberto pulling cable over HAM6 for RGA
17:14 UTC Marc to HAM6, CER, WP 8465
17:18 UTC Jim done
17:19 UTC Jason and Timesh to end X for NCAL
17:23 UTC Charge measurements are done
17:27 UTC Karen to LVEA
17:31 UTC Timesh entering end X VEA
17:33 UTC Richard to end Y
17:39 UTC Ken into end Y VEA
17:40 UTC Jeff B. done
17:47 UTC Vanessa to LVEA
17:54 UTC Gavin back, scaffolding is removed
17:58 UTC Jeff B. moving chemicals into optics lab
17:58 UTC Gerardo back
18:00 UTC Tyler back
18:08 UTC Gerardo removing old RGA computer from LVEA
18:16 UTC Jeff B. done in optics lab
18:22 UTC Gerardo done
18:31 UTC Dave restarting CAL models
18:35 UTC Tyler using tractor to remove tumbleweeds around H2 building
18:35 UTC DAQ restart
18:40 UTC Richard back
18:52 UTC Gerardo to LVEA
19:03 UTC Jim unlocking HAM5,6 HEPI
19:06 UTC Jason back
19:07 UTC Marc done
19:23 UTC Jim done
19:24 UTC Richard and Arnaud to LVEA to look at temperature sensors
19:37 UTC Richard and Arnaud back
20:10 UTC Gerardo and Betsy back
20:15 UTC Relocking, Timesh is still at end X
20:39 UTC Filiberto and Timesh done
20:42 UTC Jeff and Hugh to end X to look at wind fence install activity
20:47 UTC Filiberto and Timesh back
21:21 UTC Jeff and Hugh back
22:12 UTC Vlad to optics lab
22:15 UTC Jason to optics lab
22:20 UTC Jason done
23:13 UTC Hugh to end X to check on wind fence install activity
23:47 UTC Timesh to end X
00:04 UTC Timesh leaving end X
H1 General
camilla.compton@LIGO.ORG - posted 14:51, Tuesday 12 November 2019 - last comment - 16:19, Tuesday 12 November 2019(53185)
Re-locking after Maintenance

Camilla Patrick Sheila

1h 50 for locking
Currently  completing  Coil driver tests before we go back into Observing 
 
20:11 LVEA empty
20:13 SEI config back to WINDY
20:14 Green arms locked
20:24 DOWN at ENGAGE_DRMI_ASC (bad SRM alignment?)
20:35 AQUIRE_PRMI
20:39 DOWN. Have requested DRMI_LOCKED_PREP_ASC (when MICH and SRC1 come on, seem to have problems) 
20:45 Sheila adjusted gains ..? (These didn't help so were reverted)
20:47 DOWN at ENGAGE_DRMI_ASC Decided we have done 20 minutes of DRMI so will go to Initial Alignment
20:52 Initial Alignment 
21:04 Stuck on Xarm (ALS_XARM = FAIL unknown why)
21:14 Restarting Initial Alignment
21:30 Initial Alignment Complete 
21:32 Locking Attempt 4
22:00 For Jenne's test, stopped at LOWNOISE_ASC, and manually skipped over LOWNOISE_COIL_DRIVERS
22:03 NLN  (yay!)
22:16 NLN_CAL_MEAS (for test)
TESTS ...
 
SDF's accepted (see attached images) as Sudarshan changed the PCAL Model
Comments related to this report
camilla.compton@LIGO.ORG - 14:53, Tuesday 12 November 2019 (53200)

SDFs accepted

Images attached to this comment
camilla.compton@LIGO.ORG - 15:01, Tuesday 12 November 2019 (53201)

22:58 OBSERVING (tests finished)

camilla.compton@LIGO.ORG - 16:19, Tuesday 12 November 2019 (53206)
23:29 Lost Lock.
23:38 Had to change the TR_X and TR_Y offsets in TR COMM. Sheila noticed offsets were visible on NUC2 during FIND_IR
H1 CDS (ISC, PSL)
filiberto.clara@LIGO.ORG - posted 14:50, Tuesday 12 November 2019 - last comment - 15:14, Tuesday 12 November 2019(53199)
35.5MHz Oscillator Source

WP 8462
alog 53035

Faulty 35.5MHz oscillator source in ISC-C3 was replaced this morning.

New Unit SN S1000550
Old Unit SN S1000548

F. Clara, R. McCarthy

Comments related to this report
daniel.sigg@LIGO.ORG - 15:14, Tuesday 12 November 2019 (53202)

The PLL seems to be behaving normally and the control signal has quiet down.

Images attached to this comment