WP #7439 - Jeff B. & Dave B. All dust monitors, except End-Y and the Optics Lab are running at a 19200 baud rate. To synchronize the network port speeds across all dust monitors, today upped the End-Y dust monitor network port speed from 9600 to 19200. Reset the dust monitors for the new speeds and booted the Comtrol. Power cycled the weather station. Dave restarted the weather station (aLOG 41124). At next opportune time will do the same for the dust monitors in the Optics Lab. This will have all networked dust monitors running at the same speed.
Removed the remains of the house vacuum system from End-Y. The PCV piping and cabling are gone to recycling. Will address the mid stations, End-X, and corner station as access opportunities permit. WP #7440
Reinstalled the dust monitor VEA-2 at End-Y to cover the door removal next week. As before, it is located inside the BSC cleanroom and the alarms are set for Clean-100.
Corey & I managed to milk the new V3 sensor cable through a new length of copper braided shield. We had a 'fid' to help but more than two hands was a big factor as well. We (I) was unable to get the too large a zip tie snug enough around the cable to hold the braid in position but only at the sensor end. At the BNC connector end back at the feed thru, we could get all our hands in play and that one is secure. I have smaller peek zip ties coming from Accu-Glass arriving next week and if they can be ClassA'd in time, we'll use those. Otherwise we'll have to take the sensor off the platform and snug the tie as we did at the other end with more hands. I was worried about damaging the cable at the sensor where we can't get enough hands into play to make sure nothing but the zip tie gets reefed on. The big zip ties just require too much force to close tight enough.
We (I) still need to change the conflat gasket back at the feed thru, as well as the above mentioned cable tie job--next week.
And of course good spectra and any balancing if SQZ crew changes the payload.
We left the ISI locked.
Old Corner 3 Vertical CPS sensor SN 12023; new SN 12015.
Addendum: Since we had already reset the V3 sensor gap, we decided to re-gap what needed it. The H3 CPS was over 6000 counts and that was the hardest one to access, The other two horizontal sensors were over 1000 counts so we did those too. For the verticals, we redid V1 which was over 1300cts.
We then did an unlock/relock test and saw that the local verticals shift 200 or less counts whereas the horizontals shifted between 1600 to 2200 counts. Have to move the lockers to fix that. Naturally, in the cartesian basis, X Y & RZ have the largest shifts, namely 35000, 75000, & 16000 nanos while Z RX and RY shifted just 3600, 1400, & 5800 nanos. Resetting the sensors of course require resetting the Isolation Targets--done.
Addendum II: I will put actual redlines on D1201388 but just to put it here in case anyone thinks of a problem, we ended up with 110kg more counter weight than the plan expected by SYS--that's an awful lot of mass the plan was missing.
Chandra requested CP3 ROC cell phone alarms be silenced for the work day. We will silence the regen interlock alarm over the weekend.
following comtrol restart to speed up dust monitor serial baud rate. Burt restored to recover alarm levels.
TITLE: 03/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
Wind: 12mph Gusts, 9mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.27 μm/s
QUICK SUMMARY:
13:10 Peter is in the PSL continuing 70W alignment to the PMC
14:12 Chris is removing scaffolding from the optics lab to store at MX
Terry, Sheila, Arijit, TJ,
Today we made one more attempt to get the beam from the OPO aligned into HAM5 and out to HAM6, but we haven't found the beam.
Keita loaned us a Nikon D7100 which was much better for getting a clear picture of what we were looking at than the viewer we were using yesterday. Photos will be attached to this alog latter.
FIl also cabled the HAM5 illuminator up to the new beckhoff controls, so we could turn that on and off.
We started out by manually aligning the beam again through the apertures, doing a little bit more careful job this time by using the viewer to identify the edges of teh aperature and center the beam half way. We can still see the beam hitting ZM2 through the HAM5 viewport. We were also able to sometimes see the beam coming out the HAM5 viewport (perhaps going under the fly-offf mirror on the OFI), but latter this afternoon we weren't able to repeat that. We were never able to see a beam in HAM6.
We are leaving the OPO locked and generating a beam (we again have two soft door covers with a small gap to let the beam out). We have ZM1+ZM2 scanning with an amplitude of 10,000 counts for both pitch and yaw, and SRM scanning 1000 urad.
If this does not work, we may wait for a beam from the PSL to become available and try to see the rejected scatter from the OFI polarizer in the path towards the squeezer.
Here are some images to help clarify what we saw.
I can't find an up to date drawing of the HAM5 layout, but here is a preliminary drawing https://dcc.ligo.org/DocDB/0121/D1500303/002/HAM5.PNG, which shows ZM2 much further in the +y direction than it really is placed. In reality the beam from the OFI to ZM2 runs nearly parallel to the septum.
Here are some photos taken from the easternmost viewport on the north side of HAM 5 (the -y viewport on the +x side of HAM5). The first photo is a blurry overview of what we can see, the fly off mirror for the squeezed beam is in the center (there is a black glass clip on the back of the mirror), behind that you can see the cage of ZM2. The violet looking thing that is just peaking over the black glass clip is our beam or scatter from our beam.
The second photo shows that at some alignments on ZM1/ZM2, we can see a quite bright thing in HAM5 which is probably our beam. The fourth photo shows an alignment for ZM1 for which the beam clips on the bracket for the eddy current damper on ZM2, while the third photo shows an alignment of ZM1 where we think the beam should be hitting ZM2. You can see some difuse IR light, and what looks like the outline of the black glass clip in that scattered light. This seems like a good candidate for our best alignment, you might think that this scatter means that the beam is hitting or nearly hitting the fly off mirror with the black glass clip, however, we saw nothing in HAM6 for this alignment.
A few images and notes to help
1) Photo of path from ZM2 to OFI bench, from LHO alog 39663 and "big picture 1" see links below.
https://alog.ligo-wa.caltech.edu/aLOG/index.php?callRep=39663
https://alog.ligo-wa.caltech.edu/aLOG/uploads/39663_20171206192338_ZM2_BigPicture_1.jpg
2) LIGO-D1500303 linked above is / was a temp (preliminary) layout. Refer now to SYS links below. We have added a note to D1500303.
a) LLO
LHAM5 - LIGO-D0900456
ZM2 - LIGO-D1600094
b) LHO
WHAM5- LIGO-D0901129 (please note this top level is pending, refer to D1700472 and D0900456 for now)
ZM2 - LIGO-D1700472
Hope these help. Corey A, Eddie and Calum
Valved out X-beam manifold turbo and spun it down, so expect vertex pressure to rise. Tomorrow I plan to hard close GV2, vent XBM volume, and start loosening bolts on 10" gate valve.
The mode matched output of the front end laser was aligned into the power amplifier. After the mechanical alignment, the power amplifier was turned on at a low diode current to check that nothing was grossly wrong. When the diode current was increased to 45 A, an output power of ~84 W was measured. The beam propagation was measured and found to be consistent with data provided by neoLASE. The measurement is partly messed up by the presence of pump light and a ghost beam from the sampling mirror. An average beam diameter of 356 microns was used for the mode matching to the high power oscillator optical path. The beam path towards the pre-modecleaner was roughly aligned. Minor problems were encountered with the fit of some parts. I hope to have the pre-modecleaner locked tomorrow. Ed / Peter
It is with a somewhat heavy heart that I cut the fibers out of the final Hanford ETM to detect the first gravitational waves ever. We removed the ETMx from the lower structure and stowed it in its cake tin. The new ETMx will be installed tomorrow in prep for a fresh weld next week.
TITLE: 03/22 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:
LOG:
13:36 Peter into PSL
14:30 M2 (aka Itchy & Scratchy) @ MY VEA
14:38 Jeff B out to EY/EX for photos, reinstall dust monitors for vent and rodent checks - contamination control
15:13 King Soft on site
16:40 Bubba out to EY - to the well
16:40 Jeff B back from Ends and heading out to LVEA
16:50 Betsy and Travis out to EX
16:55 Jeff B back
17:23 Kyle, with Apollo, arrived on site
17:24 Sheila, Arijit and Terry out to HAM6
17:33 Jeff B to ITMY for camera work
17:44 Mark out to LVEA
17:56 Marc back
18:31 Chandra out to MY
18:44 Betsy and Travis back
18:45 Peter out to PSL
18:55 Jeff B back from ITMY - LSO must be informed before transition to LASER HAZARD as the cover is OFF the viewport
20:35 Jeff B out to LVEA
21:08 Betsy and Travis back out to EX
21:45 Peter back
22:09 Jeff B back for the day
Per request, pictures attached of the cryopump bake enclosure installation. The installation took two days and several modifications were made before and after the bake commenced in an effort to create more uniform heat zones within the enclosure because the bottom is not achieving target temp. Modifications include:
Improvements for future designs:
The ISS box used to be dogged down using CL5 dog clamps, and is now dogged down with CL2 dog clamps, with CL5 dog clamps installed up side down against the base. One of the clamps installed against the base is a fork clamp, installed as the South fork clamp on the East side of the box, where the ISS box is up against the PMC box, so very difficult to access. Images attached show each side of the box, and the file names identify which clamp(s) and which side. In the images, the first clamp identified is the North clamp East side, and from there the clamps are identified in a counter clockwise direction, ending with the South clamp East side (which is shown in the last two images).
I've looked at 3 consecutive glitches in TCSX QPD B using the _DQ channels added yesterday. The shape of all 3 glitches are the same, and have a shape that looks very much like a step function (with a second glitch about 3/4 of the way through the first). To the best that I can measure in dtt, the interval between the first and second glitch is 900.098 seconds, and between the second and third glitch is 900.577 seconds, so 15 minutes +/-0.5 seconds. Attached plots of the three glitches show that the ISS and RIN signals also see the glitch. Related alog 41076.
Update on what I did with ZM1 today.
Summary: the UL flag now looks much better, but I dropped a screw down into the ISI and I topped out some adjustment screws.
After talking with Jeff K this week about what might be going on, I remembered that the UL OSEM flag was slightly askew from the other flags. Jeff's data may also point to a problem coming from that area so I wanted to see if I could straighten or align the flag today. I pulled the flag and rolled it on the table and you could see that the tip of the flag was not straight. I replaced it with another that I had brought with me and it looked slightly better, but still not great. Roll tested this one as well and all looked good, hmm. So I put it back in and then tried to move the OSEM in the desired direction with some success. All the flags now seemed to sit a bit lower, so I adjusted the height but I found that the screw to lock down this adjustment couldn't reach anymore. I'll have to get some longer ones tomorrow. Overall, the UL flag is now much more centered and the others are good as well.
As I was putting the earthquake stops back on I fumbled one of the 4-40 screws and dropped it right down into one of the through holes on the table (I blame the gloves). I could not see a way to get to it without removing one of the HAM side panels, so I will consult with SEI team and take action tomorrow.
After talking with Hugh and Jim it seems that we might leave this screw where it is unless it starts to cause some issues.
As a future reminder, I dropped a 4-40x.5" SHCS over the South corner of HAM6. It fell through one of the helicoiled through holes and dropped inside the table. The hole it fell through is above spring post #1, I am told. I did not see or hear it fall through to stage 0, and I could not locate it through the holes in the wall panels on the South-East side of the table. During their CPS investigation, Hugh and Corey had one of the access panels removed on that corner, but I also did not see or feel anything.
Attached are some photos from today's CPS "vascular surgery" work. The photo names summarize what's going on.
(Also attaching a selfie of Hugh & myself after today's work. March & April are respectively our 20-Years-With-LIGO-Anniversaries. Fitting that we got to do some SEI work together this last week. LIGO Seismic Bros for Life!) 🤓 [thumbnail is upside down, but full image is good.]