H1 ISC (CAL)
camilla.compton@LIGO.ORG - posted 16:04, Wednesday 02 April 2025 (83707)
PR Gain, Circulating Power, chamber tempurature and RH settings over last 6 months

Matt, Camilla

While looking into a reason that we needed to continually increase EY RH over the last 6 months to avoid PIs, we've attached some trends.

In the past ~6 months there there was a 2% decrease in circulating power corresponding with a kappa_c decrease, Sheila and Dana found the same in 2023 75193. Plot here. Sheila and Dana thought this was as the OMC throughput has degraded since installation but we haven't re-checked that the balance of the two OMC DCPDs.

There is two distinct changes in PRG over the last 6 months: 10th Dec 2024 and 1st Feb 2025, I initially though they were conveniently a week or so before the EY RH increase, however they are when IM4 trans was centered 81735 / re-calibrated 82260 which probably cannot cause a physical change.

Interestingly the OM2 temperature is an interesting measure of the in change in temperature and that does change over the last 6 months, it's not clearly correlated with the circulating power change. Bottom trend of attached plot.

Images attached to this report
H1 SEI
camilla.compton@LIGO.ORG - posted 15:22, Wednesday 02 April 2025 - last comment - 16:14, Wednesday 02 April 2025(83705)
Looking at SEI HEPI/ISI Pointing after Locking

Ibrahim, Ryan S, Betsy, Sheila, Camilla

Getting a baseline for how much the HAM chambers have moved since they were locked.

Highlighted the highest changes but none of these look particularly large.

HAM5 and HAM6 tripped just at the end of these trends too, not included in differences above, maybe a WD trip when a SEI is locked doesn't matter anyway.

Images attached to this report
Comments related to this report
ibrahim.abouelfettouh@LIGO.ORG - 16:14, Wednesday 02 April 2025 (83708)SEI

Same comparisons are below for HAM1, HAM2, HAM3 for before and after HEPI Locking

HAM1:

L4Cs: Just got noiser since Jim moved them. I don't think this can be used as a comparison for alignment but screenshotted below nonetheless.

HEPI: Largest change is in Z with 11.2um

HAM1 plots also show another change about 4/5 hours ago, which is the HAM1 vent

HAM2:

ISI: Largest change is in RZ with 22.3urad

HEPI: Largest change is in HP by 10.9um

HAM3:

ISI: Largest change is in RZ with 23.4urad

HEPI: Largest changes are Y  by 10.3um and VP by 13.8um

Images attached to this comment
H1 PEM
ryan.crouch@LIGO.ORG - posted 15:17, Wednesday 02 April 2025 - last comment - 15:32, Thursday 03 April 2025(83706)
BSC8 Dust monitor

I set up an internally pumped dust monitor, that I borrowed from the FCES (it was off down there). I used LVEA10's network cable from the Biergartens dust monitor so BSC8s cleanroom dust monitor is trendable as Dust mon LVEA10. The pumpless dust monitor in the biergarten is still taking samples but they're not being written to epics.

Comments related to this report
ryan.crouch@LIGO.ORG - 09:46, Thursday 03 April 2025 (83715)

Trending DM10 dust monitors overnight.

Images attached to this comment
H1 General (VE)
corey.gray@LIGO.ORG - posted 14:56, Wednesday 02 April 2025 (83704)
HAM1 E/W Door Bolts Removed

Tony, Corey:  HAM1 E/W Door bolts mostly removed; except for a set of 4-bolts on each door which were detorqued and their nut backed off a 1/2 turn.

LHO VE
david.barker@LIGO.ORG - posted 10:23, Wednesday 02 April 2025 (83701)
Wed CP1 Fill

Wed Apr 02 10:04:28 2025 INFO: Fill completed in 4min 25secs

Fill tripped on a LN2 spurt before the main flow, but still looks like a good fill.

Images attached to this report
H1 CDS
david.barker@LIGO.ORG - posted 10:05, Wednesday 02 April 2025 (83698)
Timing glitch h1sush7, all models restarted

Ibrahim, Ryan S, Erik, Dave:

Around the same time as there was work being done at the corner station mechanical room mezzanine, h1sush7 had a timing glitch requiring the restart of the h1iopsush7 model (and therefore all user models).

Ibrahim and Ryan S consolidated the SDFs for h1susfc1, h1sussqzin and verified the mezanine work was completed.

We restarted all the models, reset the SWWD, cleared IPC and CRC errors to return the system to nominal.

I have added this event to an already opened ticket for h1sush7 FRS20317

Wed02Apr2025
LOC TIME HOSTNAME     MODEL/REBOOT
09:55:21 h1sush7      h1iopsush7  
09:55:35 h1sush7      h1susfc1    
09:55:49 h1sush7      h1sussqzin  
09:56:03 h1sush7      h1susauxh7  
 

Images attached to this report
H1 General
ibrahim.abouelfettouh@LIGO.ORG - posted 09:26, Wednesday 02 April 2025 - last comment - 10:02, Wednesday 02 April 2025(83695)
High Voltage Shutdown Preparation

Ryan S, Ibrahim

In prep for Fil turning off the high voltages, we ramped down and disabled some systems that use it, outlined in M1300464 (screenshot attached of specific page).

The following settings were changed:

Images attached to this report
Comments related to this report
ryan.short@LIGO.ORG - 09:30, Wednesday 02 April 2025 (83696)SQZ

I disabled all picomotor drivers (usually we keep these all disabled anyway, but still Squeezer HAM7 was the only one enabled) and turned off all SQZ TECs. The instructions only list the OPO, but there are three more: OFI, SFI1, and SFI2. I turned these off by switching the Servo toggle to "Off" in the upper-right of each TEC's medm screen (screenshot attached).

Images attached to this comment
filiberto.clara@LIGO.ORG - 09:59, Wednesday 02 April 2025 (83697)

WP 12434
WP 12260
Procedure M1300464

The following high voltage power supplies/electronics were powered off in preparation for the corner vent.

1. CER Mezzanine - ESD HV
2. CER Mezzanine - Fast Shutter HV
3. CER Mezzanine - OMC PZT HV
4. CER - SR3 and ITM heaters
5. LVEA - Fast Shutter Driver Chassis - Disabled and powered off
6. MER Mezzanine - HAM7 PSAMS HV
7. MER Mezzanine - HAM7 Piezo HV

Images attached to this comment
filiberto.clara@LIGO.ORG - 10:02, Wednesday 02 April 2025 (83699)

The interlock for HAM6 that was bypassed last December (alog 82011) has been restored. The gauge on HAM6 is scheduled to be replaced during the upcoming vent.

H1 PEM
ryan.crouch@LIGO.ORG - posted 09:02, Wednesday 02 April 2025 (83694)
HAM1 dust monitor

Yesterday I moved a pumped dust monitor into the HAM1 clean room (dust monitor LVEA5). I set the alarm levels to clean-100 following E1600132 and took a look at the trend overnight. The 0.5u particle count was steady around zero and the 0.3u was around ~10 counts overnight.

Images attached to this report
H1 CDS
david.barker@LIGO.ORG - posted 08:48, Wednesday 02 April 2025 - last comment - 10:34, Wednesday 02 April 2025(83693)
VACSTAT: gauges in vent area removed from system

Janos, Gerardo, Dave:

Following some alarms overnight we have decided to remove the LVEA gauges from VACSTAT for the duration of the vent. The other gauges which will remain under vacuum continue to be monitored, but without the increased sensitivity settings.

In order to keep the EDC green, a vacstat_dummy_ioc.py is running on opslogin0 to simulate the channels associated with the removed gauges (HAM1, HAM6, BSC2, BSC3).

The cell phone alarms to the vacuum group on multiple vacstat detections has also been disabled.

Images attached to this report
Comments related to this report
david.barker@LIGO.ORG - 10:34, Wednesday 02 April 2025 (83702)

HAM1 alarms have been removed from the system for the duration of the vent.

LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 07:46, Wednesday 02 April 2025 (83692)
OPS Day Shift Start

TITLE: 04/02 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
OUTGOING OPERATOR: None
CURRENT ENVIRONMENT:
    SEI_ENV state: MAINTENANCE
    Wind: 6mph Gusts, 4mph 3min avg
    Primary useism: 0.17 μm/s
    Secondary useism: 0.17 μm/s
QUICK SUMMARY:

IFO is in PLANNED ENGINEERING for the vent.

Today's vent tasks:

Work safe!

H1 CDS
filiberto.clara@LIGO.ORG - posted 18:24, Tuesday 01 April 2025 (83691)
CDS EE Work On HAM1

WP 12424
The field cabling for RM1 and RM2 was disconnected in the CER and field rack. Cables were pulled back from ISC-R4 to SUS-R1. Cables were installed early on and buried in the cable tray. It was decided to cut the connector to ease cable work. Ends will need to be re-terminated. The PM1 field cables arrived onsite and will be installed tomorrow. Work will be outside the HAM1/2 clean room.

WP 12393
The SEI field cables were pulled to the following HAM1 flange locations:

Corner 1 (GS-13, L4C, ISI Coil Drive) to Flange D1
Corner 2 (GS-13, L4C, ISI Coil Drive) to Flange D5
Corner 3 (GS-13, L4C, ISI Coil Drive) to Flange D3
HEPI Corner 1&2 to Flange D5
HEPI Corner 3 to Flange D3

WP 12421
Cabling to IOHT2L and ISCT1 was disconnected. Both sets of cables were pulled out of the clean room, clear of any HAM1 activities. The safety interlock system was tripped when cables were being moved off ISCT1. Safety system was restored. The field EtherCAT field boxes EL1908 and cables are located on top of HAM1. They should not interfere with door removal/install.

WP 12422
The vertical cable tray, conduit and part of the floor cable tray was removed to clear the HAM ISI Installation Fixture. Cables to ISCT1 are now routed along the cable tray outside of the clean room.

We took time to pull out various DB cables, fibers, RF cables ect that were not being used. Area around HAM1 is now clear. Let us know you see or need anything else moved/cleared for the ISI install.

F. Clara, O. Patane, M. Pirello

Images attached to this report
LHO VE
janos.csizmazia@LIGO.ORG - posted 18:04, Tuesday 01 April 2025 (83690)
2025 April vent - VAC diary
- The corner station clean air supply (Kobelco) was started up
- The following GVs have been closed: GV5, GV2, RV1, FCV1, FCV2, FCV3, FCV4, FCV5
- The IPs adjacent to this part of the corner volume have been valved out: IP1, IP2, IP3, IP4, IP14
- The replacement of the HAM6 gauge was attempted, but the electronics of the brand new Inficon replacement gauge is faulty, therefore another one will be installed tomorrow
- The Y-manifold turbo has been valved in with a leak checker backing, and the following flanges have been leak checked (no leaky flanges yet):
 - Y-manifold flanges:
  - X-; Y+ flanges (3 pcs.)
  - Vent port (1 pc.)
 - BSC8:
  - X- HEPI bellows (2 pcs.)
  - X- collar flanges (4 pcs.)
  - X+ Y+ side flanges (3 pcs.)
  - X+ door flanges (5 pcs.)
 - HAM2-HAM3 spool:
  - X+ Y+ side flanges (5 pcs.)
  - X+ bottom flange (1 pc.)
 - HAM3:
  - Y+ door flanges: (5 pcs.)
  - X- bottom flange (1 pc.)
  - Y+ bellows (2 pcs.)
LHO General
ibrahim.abouelfettouh@LIGO.ORG - posted 16:33, Tuesday 01 April 2025 (83688)
OPS Day Shift Summary

TITLE: 04/01 Day Shift: 1430-2330 UTC (0730-1630 PST), all times posted in UTC
STATE of H1: Planned Engineering
INCOMING OPERATOR: None
SHIFT SUMMARY:

IFO is in PLANNED ENGINEERING for VENT

Extremely productive first vent day in which the following planned tasks were completed:

As always, check out the trello for the most up to date vent news.

Guardian states are in the configurations attached in the screenshot

LOG:

Start Time System Name Location Lazer_Haz Task Time End
14:39 FAC Eric Woodshop N Activate Fire Pumps 16:21
15:05 EE Fil LVEA N HAM1/2 Table Enclosure Disconnect 23:52
15:10 FAC Kim, Nellie FCES N Technical Cleaning 15:39
15:12 OPS TJ LVEA N LVEA to Laser Extra Safe (Keys, Light Pipes etc) 15:30
15:34 PCAL Tony PCal Lab Local Meas. Setup 16:47
15:39 FAC Kim EX N Technical Cleaning 17:00
15:40 FAC Nellie EY N Technical Cleaning 16:22
16:09 AOS Betsy OptLab N Power meter 16:22
16:24 FAC Tyler, Eric LVEA N Scissor lift, Crane Work 18:27
16:24 SAF Camilla LVEA N Guillotine for viewports 19:05
16:26 VAC Janos, Gerardo, Travis, Jordan LVEA N Corner Vent Prep 19:25
16:26 EE Betsy LVEA N Checking on Fil team 17:11
16:36 AOS TJ LVEA N Wrap Bag Tag Help 19:05
16:46 SEI Jim LVEA N Locking HAM HEPIs 18:01
17:01 FAC Kim, Nellie LVEA N Technical cleaning 18:49
17:30 FAC Richard LVEA N HAM1 Conduit 17:45
17:43 AOS Ibrahim LVEA N Moving ISC tables 19:05
17:51 FAC Betsy LVEA N Looking at cabling 19:05
18:09 ISC Rahul, Mayank, Siva OptLab Local ISS array work 22:56
18:20 CAL Tony PcalLab Local Measurement setup 18:30
18:25 SEI Jim, Mitchell FCES, Ends N Picking up parts and FAMIS tasks 21:20
19:17 FAC Chris, Eric, Tyler, Randy LVEA N Cleanroom move 20:52
19:35 EE Oli LVEA N Helping Fil 22:29
19:43 VAC Gerardo LVEA N Cleanroom move help 22:06
19:58 AOS TJ, Camilla LVEA N Move Scaffolding by HAM1/2 20:34
20:07 VAC Janos, Jordan LVEA N Leak Checks 22:06
20:14 PCAL Tony PCAL Lab N PCAL Meas. 20:20
20:46 ALS TJ EX, EY N Turning on ALS 21:27
20:56 FAC Tyler LVEA N Sock Swap 21:38
21:33 TCS Matt, Camilla OptLab Local CO2 Table Work 22:56
21:52 SEI Mitchell LVEA N Seismic Assy Size Verification 21:58
21:53 AOS Betsy LVEA N Walkabout 22:33
22:06 EE Marc LVEA N Helping Fil and Oli with HAM 1/2 Table Enclosures 00:05
22:07 VAC Janos LVEA N Leak Checks 22:41
22:41 VAC Travis, Gerardo, Jordan LVEA N   23:41
22:42 FAC Tyler LVEA N Rigging Transportation 22:53
23:14 AOS Betsy LVEA N   23:25
23:29 OPS Ryan C LVEA N Dust monitor connectiom 00:29
Images attached to this report
H1 SUS (SEI, SUS)
edgard.bonilla@LIGO.ORG - posted 22:54, Thursday 27 March 2025 - last comment - 16:43, Tuesday 01 April 2025(83605)
Calibrating the PR3 OSEMs

Follow up to LHO alog 83200 and LHO alog 80863.

Brian and I thought of a better way of getting the M1 OSEMs in PR3 calibrated relative to the HAM2 GS13s: Use the ISI drives in L, T, V for frequencies above the suspension resonances to get an absolute calibration.

We can use the measurements Jeff took in LHO alog 80863 and project them in the OSEM basis, then use the translational (Longitudinal, Transverse, Vertical) drives to calibrate the OSEMs. Since the GS13s are calibrated to [m] all of the transfer functions (shown in the first attachment) are in [OSEM meters]/[GS13 meters]. At high frequencies (sufficiently above the resonances) the OSEMs should just be measuring (-1)*ISI motion, because the suspension is isolated. The calibration error will depend on how well we are able to drive L,T,V from the ISI without cross-coupling to any other DOF.

Figure 1 attached shows the 6x6 transfer matrix between the ISI drives and OSEMs (inputs are columns, and outputs are rows). We highlight the 6 translational transfer functions that can be used to calibrate the OSEMs in red. The drives seem decoupled enough to do the calibration (for example, we expect to see a length drive only in LF and RT, no motion anywhere else).

Figures 2,3, and 4 show a detail of the 6 transfer functions we will use for calibration, all of them should be scaled to 1 [OSEM m]/[GS13 m]. The scalings are:

            T1         T2          T3          LF          RT         SD
       1.544          0            0            0            0            0      T1
            0        1.394         0            0            0            0      T2
            0            0        1.273         0            0            0      T3
            0            0            0        1.411         0            0      LF
            0            0            0            0        1.588         0      RT
            0            0            0            0            0        1.366   SD
Two things to note:
1) The relative calibrations are consistent with the ~15% mismatch that led to the V to R and the L to Y couplings that Brian and I observed in the comments of LHO alog 83200.
2) The absolute calibrations being in the ballpark of 1.5 seem large, but they are close to the calibration factor in plotHLTS_ISI_dtttfs_M1.m that transforms between [um/drive cts] to [m/N]. The transfer functions plotted always seem about a factor of 1.5 off from the MATLAB model. Maybe there's a connection that explains why the calibration factor seems so large.
 
Figure 5 shows all of the diagonal ISI to M1 transfer functions after applying the calibration factors. They all asymptote to 1 at high frequencies even though we only used L, T, and V for calibration. A good sign that we're on the right track.
 
Figure 6 shows the effect of the calibration on the M1 to M1 transfer matrix (inputs are columns, and outputs are rows). The solid Black trace is the corrected M1 to M1, the dashed lines show what it was before the sensor calibration. A few of the cross couplings become significantly better: [L-Y], [V-P-R] are the best performing.
 
I think this gets enough benefit for the ISI - SUS estimatior. It also might be worth trying this scheme in other suspensions where we would benefit from eliminating more cross terms in the OSEM transfer matrix.
Images attached to this report
Comments related to this report
edgard.bonilla@LIGO.ORG - 13:51, Friday 28 March 2025 (83619)

Adding here the phases for the TFs used for the calibration. There's a 20 to 25 degree phase loss after the last resonance up to 20 Hz. I'm not sure what more to make out of it, I thought the phase loss would be an artifact of the OSEM readouts, but maybe someone with more knowledge can chime in.

 

 

Images attached to this comment
edgard.bonilla@LIGO.ORG - 16:43, Tuesday 01 April 2025 (83689)SEI, SUS

One way to fix the cross-coupling without having to get the absolute calibration is to slightly modify the M1 PR3 osem gains. They currently sit at:

    T1         T2          T3          LF         RT         SD

 1.161    0.998    1.047    1.171    1.163    1.062

 

Their new values would be at

    T1         T2          T3          LF         RT         SD

1.164    0.903    0.866    1.073    1.199    0.942

This change will still leave a scaling factor of 1.54 m/(OSEM m), but at least it should fix the L-Y and the V-P-R cross couplings.

LHO VE (CDS, ISC, OpsInfo, SYS, VE)
corey.gray@LIGO.ORG - posted 10:40, Friday 27 December 2024 - last comment - 10:04, Wednesday 02 April 2025(82011)
HAM6 Interlock Status After HAM6 Vacuum Gauge Failure Last Night

(Dave Barker, Fil Clara, Jenne Driggers, Corey Gray, Gerardo Moreno, plus those who signed work permit and whom I phoned last night)

Last Night Recap:
Last night at 959pmPT, there was an audible alarm for the HAM6 vacuum gauge (PT110).  Gerardo went out to check to see if it was dead.  He phoned Fil and they did a power cycle of the gauge to see if this would improve the situation, but it did not.  After this, H1 was taken to IDLE for the night (OWL shift cancelled).  (Should have taken Observatory Mode to CORRECTIVE MAINTENANCE at this point, but only remembered to do this this morning.)

Work Permit 12260 generated.  Fil arrived on-site around 9amPT (17utc).

This Morning's Summary of Fil's Work:

The HAM6 Interlock (for operations of the Fast Shutter + PZT) is now Using the BSC3 Interlock (or VAC gauge from BSC3 since it was decided to BYPASS the HAM6 VAC gauge which failed last night [alog 82005]).  This means that the BSC3 Interlock is no longer being used for the ITM ESDs (which sounds like it's fine because Jenne/Fil said we don't use the ESDs for the ITMs).

Fil noted that he confirmed that the Fast Shutter Chassis in the LVEA is OPERATIONAL.  Fil then left the site after giving me this summary.

As far as a test of this new HAM6 Interlock configuration, I intentionally ran a test of the AS Port Protection system (sitemap/SYS/ AS Port Protection....this was my first time doing this).  After clicking the RUN (test) button, after a few seconds received an "OK" for the (1) Test & (2) Fault.  After this test and the signed-off Work Permit, we are OK to GO for High Power locking.

Currently running an Initial Alignment (note:  ISC_LOCK initially went into ERROR [red box] when I selected Initial Alignment (screenshot of error message attached).  LOAD-ing ISC_LOCK (suggested in the Log) cleared this up.

ALSO: 

Images attached to this report
Comments related to this report
jenne.driggers@LIGO.ORG - 12:09, Friday 27 December 2024 (82013)

Sheila reminded me that we do use ITMs for acquisition, so she's making modifications to the guardian so that we'll use ETMY instead of the ITMs for acquisition.

corey.gray@LIGO.ORG - 10:40, Saturday 28 December 2024 (82031)FRS

FRS:  https://services1.ligo-la.caltech.edu/FRS/show_bug.cgi?id=32955

filiberto.clara@LIGO.ORG - 10:04, Wednesday 02 April 2025 (83700)

HAM6 interlock has been restored. HAM6 gauge is scheduled to be replaced during upcoming vent. See alog 83695.

H1 SQZ (VE)
camilla.compton@LIGO.ORG - posted 09:40, Wednesday 25 August 2021 - last comment - 12:16, Wednesday 02 April 2025(59714)
Rough Balancing of OPOS Complete

TJ and I completed a rough balance of the VOPO platform in the optics lab.

Done without cables as they and mounting hardware are not yet ready. We struggled to get the H1,V1 side of the platform up high enough. Platform was floating with 25-75g mass on OPO lid but H1,V1 bottoms out with 125g.  We will have some play of where we route the cables on the OPO lid which can help us. Attached are photos of the vertical alignment at the 3 blade posts, 1 and 2 were centered, 3 was a very little low.

Shown in photo 1 bottom we used: lateral masses: D1500421-v3 s/n1; D1900503; small weights: qty2 D1500480-v2 300g; D1500479-v2 500g; D060359 100g;
Shown in photo 1  right side we used: qty2 D060359 100g; lateral mass D1500419-v4 s/n2; D060359 25g; Dog clamp;
Shown in photo 2 we used: D1500480-v2 300g.
 
We will discuss with the SQZ team if we are happy the the dog clamp as a cantilever will not create any strange modes.
We used part D1900503 which doesn't have the smoothest finish but comparing to the roughness gauge (photos of top and side) we think will be okay, it is smother than 250P. Tagging VAC  for thier opinion.
Images attached to this report
Comments related to this report
chandra.romel@LIGO.ORG - 11:22, Wednesday 25 August 2021 (59717)

Not ideal given the roughness adds surface area, but given these parts passed C&B RGA scans, we'll allow this one-time exception.

camilla.compton@LIGO.ORG - 12:16, Wednesday 02 April 2025 (83703)SUS

This was not updated in ISC, ASSY-D1500295-D1500295-H1, I have now removed D1500420, D1500422, D1500423, D1500479 x1, D1500480 x2,  and added D1500419-v4 02, D1500421-v3 s/n1, D1900503-v1 005 to the record. The D060359 parts are bulk so not updated, more were added when balancing in chamber 59939