Displaying reports 70881-70900 of 85746.Go to page Start 3541 3542 3543 3544 3545 3546 3547 3548 3549 End
Reports until 09:27, Tuesday 25 November 2014
H1 PSL (PSL)
peter.king@LIGO.ORG - posted 09:27, Tuesday 25 November 2014 (15283)
PSL Weeklies
PSL laser weekly trends.
Images attached to this report
H1 SEI
hugh.radkins@LIGO.ORG - posted 09:09, Tuesday 25 November 2014 (15280)
WHAM3 HEPI has Correct Local <==> Cartesian Matrices and new generic controllers

See attached for the time series of the process, all done less than thirty minutes.  HEPI isolates first time, ISI & IMC remained locked.  Keita says it looks good (enough?.)  I tweeked the RZ target ~100nrads to bring the ISI OpLev 'Yaw' (yes, still reversed) back to before reading.  I didn't tweek pitch but is within a couple 'units' on the ISI OpLev.

The signs changed on the RX RY & RZ with the matrix correction but all the amplitudes were correct.  The output matrix was a mess though and looks much better now--see second attachment for a before & after view of the matrices. The correct matrices are in the right column.

Updated safe.snap and foton txt file commited to svn r9202.

Images attached to this report
H1 CDS
patrick.thomas@LIGO.ORG - posted 09:06, Tuesday 25 November 2014 - last comment - 09:49, Tuesday 25 November 2014(15282)
starting Conlog backup


			
			
Comments related to this report
patrick.thomas@LIGO.ORG - 09:49, Tuesday 25 November 2014 (15284)
Backup done. Took approximately 19 minutes. Compressed from 13G to 1.6G. Saved in /ligo/lho/data/conlog/h1/backups/h1conlog_dump_25nov2014.sql.tgz.
H1 CDS
patrick.thomas@LIGO.ORG - posted 09:06, Tuesday 25 November 2014 (15281)
starting Conlog backup
Searches unavailable for duration.
LHO General
bubba.gateley@LIGO.ORG - posted 09:01, Tuesday 25 November 2014 (15279)
DCS Construction work
Work will be starting today on the new DCS area in the VPW as well as outside between the H-2 building and the VPW. Today's activities will include some shallow excavation work outside by George Grant Construction. Inside work will include hanging a temporary curtain in the VPW to isolate the construction area from the C & B area and layout for refrigeration lines by Apollo and George Grant.
H1 SYS (VE)
hugh.radkins@LIGO.ORG - posted 07:45, Tuesday 25 November 2014 (15277)
Praxair to YMid at 1540utc
H1 CDS (DAQ)
david.barker@LIGO.ORG - posted 07:25, Tuesday 25 November 2014 (15276)
CDS model and DAQ restart report, Monday 24th November 2014

model restarts logged for Mon 24/Nov/2014
2014_11_24 06:39 h1fw0
2014_11_24 17:43 h1fw0

both unexpected restarts. Conlog frequently changing channels report attached.

Non-image files attached to this report
H1 ISC
alexan.staley@LIGO.ORG - posted 00:49, Tuesday 25 November 2014 - last comment - 07:04, Tuesday 25 November 2014(15272)
ALS COMM HANDOFF to TRX+TRY

Stefan, Matt, Kiwamu, Evan, Alexa

Images attached to this report
Non-image files attached to this report
Comments related to this report
stefan.ballmer@LIGO.ORG - 01:31, Tuesday 25 November 2014 (15274)
Attached are a transfer function showing the matched signals, as well as a StripTool plot of the successful sqrt(TRX+TRY) handoff.
Images attached to this comment
lisa.barsotti@LIGO.ORG - 07:04, Tuesday 25 November 2014 (15275)ISC
Well done! As far as I can tell, the unlock happens at 1100940293. The vertex seems happy, the first thing to go is the Y green. 
Images attached to this comment
H1 General
jeffrey.bartlett@LIGO.ORG - posted 16:12, Monday 24 November 2014 (15270)
Ops Shift Summary
LVEA: Laser Hazard
Observation Bit: Commissioning  

06:45 Karen – Cleaning in the LVEA
08:00 Tweaked the ISS Reference Signal voltage to raise Diffracted Power up to 8.5%  
08:47 Manny – In LVEA to check power racks near HAM2
09:00 Bubba & Mitch – Remove top from HAM ISI Storage Container and position Cleanroom
09:11 Filiberto & Aaron – At End-Y working on PEM power
09:13 Lockheed Martin locating services on site checking route to VPW
09:30 Cleaning crew – First cleaning on storage move cleanroom  
09:45 Bubba & Mitch – Finished in LVEA 
10:00 Bubba – Big-Red moving BSC Storage Container from LVEA Hi-Bay to Staging building
10:20 Added 300ml of water to Diode chiller
10:52 Bubba – Finished moving BSC Storage Container to Staging building
11:37 Filiberto & Aaron – Back from End-Y
11:50 Grant on site to deliver equipment for trenching work
12:35 Hanford testing emergency alarm system   
H1 ISC (ISC)
matthew.evans@LIGO.ORG - posted 15:24, Monday 24 November 2014 (15269)
ASC Filter Change

Alexa, Matt

In an attempt to get stable, if low-bandwidth, loops, we made some cut-off filters.

The new ASC filter in FM5 is:

LP0.2 zpk([0.0025+i*0.499994;0.0025-i*0.499994],[0.1+i*0.0979794;0.1-i*0.0979794;0.05+i*0.193649;0.05-i*0.193649],1,"n")

A couple of old filters that got lost were:

ASC_PRC1_Y FM5 "res1.35" resgain(1.35,10,10)resgain(3.16,10,10)
ASC_MICH_P FM5 "LP15_new" ellip("LowPass", 4, 1, 20, 15)cheby1("LowPass", 2, 1, 100)gain(2, "dB")
 

H1 PEM
filiberto.clara@LIGO.ORG - posted 15:11, Monday 24 November 2014 - last comment - 12:37, Tuesday 25 November 2014(15268)
H1 PEM Cabling at EY
Aaron and I continued with PEM cabling at EY this morning. We have completed all long cables runs and started installing the permanent power supplies in the DC rack. We disconnected the power supplies powering the microphones in both the VEA and EBAY and placed them in the DC rack. Got a call from commissioners asking us to leave EY, before we could reconnect microphone power with permanent power supplies. Will go back tomorrow morning and power them up. 
Comments related to this report
filiberto.clara@LIGO.ORG - 12:37, Tuesday 25 November 2014 (15287)
Microphone power was reconnected at EY this morning.
H1 PSL
jeffrey.bartlett@LIGO.ORG - posted 14:16, Monday 24 November 2014 (15267)
PSL Status
PSL Status: 
SysStat: All Green, except VB program offline 
Output power: 33.2w  
Frontend Watch: Green
HPO Watch: Red

PMC:
Locked: 4 days, 16 hours, 33 minutes
Reflected power:    2.6w
Power Transmitted: 22.9w 
Total Power:       25.5w 

FSS:
Locked: 0 days, 0 hours, 43 minutes
Trans PD: 1.810v

ISS:
Diffracted power: 9.39%
Last saturation event: 0 days, 14 hours, 28 minutes  

H1 General
jeffrey.bartlett@LIGO.ORG - posted 14:16, Monday 24 November 2014 (15266)
08:30 Meeting Minutes
Work on PEM power at End-Y
Locate Services on site Monday
Trenching work from OBS to VPW on Tuesday & Wednesday
Staging HAM ISI Storage container and Cleanroom in LVEA for 3IFO suspensions storage moves
HAM3 & BSC2 HEPI configuration work on Tuesday
H1 PSL
evan.hall@LIGO.ORG - posted 13:26, Monday 24 November 2014 - last comment - 00:07, Tuesday 25 November 2014(15265)
FSS gain reduced

When the modecleaner is kicked out of lock, the FSS oscillates and prevents relocking.

I've reduced the FSS common gain from 30 dB to 24 dB. Now the modecleaner relocks without issue.

Comments related to this report
evan.hall@LIGO.ORG - 00:07, Tuesday 25 November 2014 (15273)

Even at 24 dB, the FSS common loop will still oscillate every so often.

H1 ISC
alexan.staley@LIGO.ORG - posted 12:19, Monday 24 November 2014 (15264)
EY REFL B misaligned ?

I noticed that ALS-Y_REFL_B_DC does not seemed to be aligned. The error threshold has been lowered so that the flag does not go off and we can still lock. I am not sure when this misalignment happened or if this was intentional (I can't remember). Whoever goes down to EY first, can he/she align it?

H1 ISC
daniel.sigg@LIGO.ORG - posted 12:04, Monday 24 November 2014 (15263)
Re-centered ETMY green WFS

(Elli, Daniel)

Went to EY to center the green beams on the WFSs. They were too far out for the PZT mirrors. Auto-centering enaged and working again.

Displaying reports 70881-70900 of 85746.Go to page Start 3541 3542 3543 3544 3545 3546 3547 3548 3549 End