Displaying reports 77081-77100 of 83069.Go to page Start 3851 3852 3853 3854 3855 3856 3857 3858 3859 End
Reports until 14:57, Tuesday 23 April 2013
H1 INS
jodi.fauver@LIGO.ORG - posted 14:57, Tuesday 23 April 2013 (6171)
X End status
There was some discussion WRT options and timing for moving the BSC ISI from the staging building to X End. Mark Layne will pursue getting a flat bed on-site by Monday, 29 April, for ISI transport. 

The fit check of the Test Stand cleanroom was completed and the cleanroom moved from over the beamtube. The test stand cleanroom was partially (3/4) re-assembled. The IAS table was dis-assembled and relocated to the gate valve area. All remaining items needed from Y End were moved to X End. Half of the work platforms were assembled around BSC9.
H1 INS
jodi.fauver@LIGO.ORG - posted 14:56, Tuesday 23 April 2013 (6172)
HIFO Close-out
Mark Layne was informed ~ 1:30 that all sub-systems had signed off on BSC2, so the Apollo crew was re-called from X End for dome replacement. The dome was in place by 3:15 and the bolts are being torqued now. Hard covers will be installed before the crew leaves today. 

Below, please find the checklist that Apollo is using to sequence their close-out activities.

1.	Remove Walking Plates from BSC 2 (Place in E-Mod Staging Cleanroom)-done
2.	Replace dome on BSC2 (Check with SEI first: unlock ISI check cables-done
3.	Place hard cover on BSC2/HAM3 spool openings-in progress
4.	Install curtains on HAM3 cleanroom
5.	Move BSC cleanroom to beamtube by East Bay pipe bridge
6.	Dis-assemble Work Platform (Place on floor by BSC7)
7.	Move HAM3 cleanroom north as far as possible
8.	Close gaps in cleanroom to contain BSC2 spool area
9.	Move SEI related electronics over center of spool area
10.	Insert small spool piece
11.	Insert large spool piece
12.	Install HAM3 east door
13.	Move cleanroom from pipe bridge area to HAM4-plug in-turn on
14.	Call for HAM4 cleaning
15.	Install HAM2/1 east doors
16.	Install HAM 2/3 west doors
17.	Install BSC1 viewports
18.	Remove HAM4 north door
19.	Install blank on septum plate between BSC2 and HAM4
20.	Install HAM4 north door
H1 SUS
travis.sadecki@LIGO.ORG - posted 14:27, Tuesday 23 April 2013 (6169)
BS elliptical baffle dog clamps installed

The ITMy elliptical baffle has had its 2 dog clamps installed.  The ITMx baffle has only had one of its 2 dog clamps installed due to the presence of SUS dog clamps.  Per the direction of the install lead, we will leave these dog clamps as is until the hole pattern issue is resolved and the dog clamps can be correctly installed. 

Images attached to this report
H1 SUS
mark.barton@LIGO.ORG - posted 14:24, Tuesday 23 April 2013 - last comment - 09:00, Wednesday 24 April 2013(6170)
Added biquad flag
I added the biquad=1 flag to the cdsParameters block of the following models, and did a make (but not a make install yet) to test for successful compilation. All were OK, so I svn committed them. I'll do a make install later, when people are done for the day.

h1susauxb123.mdl 
h1susauxb6.mdl 
h1susauxh2.mdl 
h1susauxh34.mdl 
h1susauxh56.mdl
h1susbs.mdl 
h1susbstst.mdl 
h1susetmy.mdl 
h1susitmy.mdl 
h1susmc1.mdl 
h1susmc3.mdl 
h1suspr2.mdl 
h1suspr3.mdl 
h1susprm.mdl
h1susquadtst.mdl 
h1sussr2.mdl 
h1sussr3.mdl 
h1sussrm.mdl 
h1sustmsy.mdl

The following models already had the flag and will not be touched:
h1susim.mdl
h1susmc2.mdl
h1susomc.mdl
Comments related to this report
mark.barton@LIGO.ORG - 16:05, Tuesday 23 April 2013 (6173)
After Cheryl finished I mostly completed the job:

* All models got a make-install. 
* All models were restarted.
* All models got a diag reset.
* All models were BURT restored to the state at 14:00 hours.
* Damping was reenabled on etmy, itmy, mc1, mc3, pr2, pr3, prm
* Damping was NOT reenabled on bs or tmsy because the USER DACKILL screens don't come up.
* The PRM has such a large offset that it trips the IOP watchdog after a few minutes. I presume the IO team has been running it with the bypass enabled.
* The backup for MC1 was corrupt and I had to manually edit out some lines with incomplete strings, e.g., "LOCK . Dave says this looks like a bug he thought had been fixed and is investigating.
mark.barton@LIGO.ORG - 09:00, Wednesday 24 April 2013 (6181)
The problem with the DACKILL screens turned out to be because they had been set to open on the right physical screen and this had gone to sleep on opsws1 yesterday. I opened 

/opt/rtcds/userapps/release/sus/common/tmts/SUS_CUST_TMTS_DACKILL.adl

and 

/opt/rtcds/userapps/release/sus/common/tmts/SUS_CUST_BSFM_DACKILL.adl

in MEDM, dragged them to the left screen, made a trivial change and reverted it to "dirty" the window, and saved and committed them.
H1 IOO
cheryl.vorvick@LIGO.ORG - posted 14:04, Tuesday 23 April 2013 (6168)
IO is done in HAM2 and HAM3:
- Sheila, Keita, Cheryl

- PRM bias relief was successful:

- PRM alignment is good, with one issue with the IOP watchdog when parked:

New aligned biases that send REFL to HAM1 are:
P = -830
Y = -50

New parked biases that send REFL to it's parking spot through the baffle on the viewport on the top of HAM2 are:
P = -330
Y = -6100

The parked position of PRM will trip the IOP DC watchdog, and HIFO will run with the PRM parked most of the time, so this needs a solution.  The PRM is damped when it's parked, so one solution might be to give it it's own IOP watchdog.

- AOE2 which is in front of IM4, and is currently just a baffle, was moved by 1-2mm in the -X direction on HAM2.  This was necessary to allow the parked REFL beam to pass through the baffle with enough clearance to withstand small beam position changes and not clip.  The forward beam is off centered on that baffle aperture in order to accommodate the parked REFL beam, and has plenty of clearance to withstand small beam position changes.

- Pictures of iris alignment clamps left attached to the HAM tables were taken.   These alignment clamps are in front of MC1, MC2, and MC3, and PR2, and on MC3 Trans, and PRM Trans.
H1 CDS
david.barker@LIGO.ORG - posted 11:54, Tuesday 23 April 2013 (6167)
timing error on h1sush2b, models restarted

The h1sush2b front end encountered a timing error this morning at 08:48 local time. The IRIG-B timing diag went into the 1800 range immediately. There was no error at the IO Chassis end, a restart of the IOP model cleared the error. After restarting the user model h1susim I BURT restored it to 4am as per Cheryl's request.

H1 IOO
sheila.dwyer@LIGO.ORG - posted 09:48, Tuesday 23 April 2013 (6166)
ABCD matrices for IO
The attached script is a quick calculation of the ABCD matrices from the MC waist and IM1, IM2, IM3, IM4 to PRM that Keita asked for yesterday. It is based on optics coordinates found in T080078-05  (written in 2008)  It doesn't take into account the angle of incidence on the curved mirrors.  
If someone from IO has done a more careful job or used more up to date coordinates, it might be useful to send a link. 

Cheers, Sheila
Non-image files attached to this report
H1 IOO
cheryl.vorvick@LIGO.ORG - posted 22:49, Monday 22 April 2013 (6153)
change in position of HAM2 and HAM3 between locked after the vent and payload change vs refloated and reballanced:
good alignment before ISI work			
4/9 7:00:00 to 13:00:00			

alignment before flashing IMC			
4/18 21:10:00 to 21:25:00			


--- HAM2 ISI ---
	9-Apr	18-Apr	diff
H1	-3860	-3300	  560
H2	-2270	-2670	-400
H3	    680	 -230       -910

V1	    712	  425 	-287
V2	    -81	-470 	-389
V3	-1728	  -90	        1638

calibration is 32768cts/mm		

PRM sees mostly V2 and V3		

1638 - (-389)	2027	counts

with calibration
0.062	mm

distance between V2 and V3		

49.5 inches	1257mm	

change in angle		

4.9324E-05	49	urad	

49urad at 16.5m			

0.0008085m	

---- punchline - tilt of the table causes 0.8 mm beam displacement at MC2/HAM3, and all numbers are within the stated spec. of 1600 counts change (well, one is 1628 counts).



--- HAM3 ISI ---

	9-Apr	18-Apr	diff
H1	-300	   -465	-165
H2	  175	     410 	  235
H3	  417	   -25 	-442

V1	-192	 -710	-518
V2	-450	 -430	    20
V3	  275	  290	            15

These numbers are much smaller than the numbers for HAM2.

---- punchline here is that this shows that changing the payload one HAM2 did change the position of the ISI table while it was locked.




----
Attached is a graphic of the table rotation, for HAM2 and HAM3, as I understand it.  Arrow length corresponds to the change, and can be compared between HAM2 and HAM3.
Images attached to this report
H1 AOS
keita.kawabe@LIGO.ORG - posted 19:51, Monday 22 April 2013 (6165)
HAM3 oplev mirror holder is good

It is not occulting the POP-ALS beam path.

H1 IOO
keita.kawabe@LIGO.ORG - posted 19:46, Monday 22 April 2013 (6164)
IO alignment (Sheila, Cheryl, Keita)

Summary:

MC alignment as well as IMs are very good. The beam hits the center of PRM and PR2. 

With this good alignment, when we steer PRM so that the REFL goes back to HAM1 without clipping, PRM alignment offsets are now 3395urad for PIT and 50urad for YAW. The largest DAC output decreased from -126000 counts (almost railing) to about -10750  -100750 counts,  so it's somewhat better but not that much. It seems like PRM really tilted.

At this point, PRM offset should be released, and after that right PRM offset should be re-established.

What was done:

  1. Both pico mirrors and fixed mirror upstream of MC1 were used to center the beam on MC2 as well as on MC1 (mostly MC2).
  2. MC2 was aligned so the single-bounce beam off of MC2 comes to a correct position in HAM2.
  3. Used MC3 and MC1 to refine MC alignment. Excellent 00 flashes.
  4. Used IM1 and IM2 so the forward-going beam goes through Faraday input and output aperture at roughly the same positions as before. No clipping.
  5. Used IM3 to bring the beam to the center of PRM, and IM4 to center the bean on PR2, and iterate.
  6. Align PRM to center the REFL beam on the baffle hole for HAM1 beam path.

Observation after the above:

What was further done:

  1. Misalign PRM to direct the REFL beam to the parking beam dump. PRM offsets railed and the beam was still not centered on the baffle hole for the beam dump.

What needs to be done:

  1. Relieve PRM bias.
  2. Align PRM so we have a nice refl beam again.
  3. Confirm that we can misalign PRM to park the beam.
  4. Move the baffle in front of IM4 somewhat closer to HAM1 and confirm that there's no clipping.

What doesn't need to be done:

  1. Revisit beam paths to IOT2L viewports. It's impossible for these beams to miss the viewports by these tiny changes (tiny in comparison to the viewport size).
  2. Revisit POP QPD sled (PRM-PR2 line is good), MC2 trans QPD (the beam is centered on MC2 so the transmission will hit the QPD), and SM2 trans QPD (lever arm is small so this change would not make the beam completely miss the QPD). We will use picos once things are under vacuum.
LHO General
michael.rodruck@LIGO.ORG - posted 16:27, Monday 22 April 2013 (6163)
Ops summary

I took over from Pablo at 3, this is his report:


    LVEA
- Cheryl working on MC trying to understand some discrepancies
- Filiberto/Richard pulling cables and checking connectors
- Michael R. working in Pcal pre-alignment at H2 LAE
- Arnaud, BS TF ended around 11AM
- Thomas viewport alignment using 635nm, power <5mW laser

    EX
- Dust monitor alarm of 1800 PCF for > 0.3u, and 860 PCF for > 0.5u, possible cause Apollo work

    EY
- Thomas ETMY OptLevel alignment using 635nm, power < 5mW laser

Vincent restarted suspension/seismic models

H1 SEI
hugh.radkins@LIGO.ORG - posted 16:15, Monday 22 April 2013 (6162)
WBSC2 SEI/HEPI Status: HEPI Locked, Pier3 (SE) IPS appear Dead

We (JimW & I) locked up the HEPI to safeguard the ISI/SUS from external influences such as Walking Plate removal & Dome installation.  We found the Pier3 IPS unresponsive at -3200 cts.  We locked it up using the dial indicators.

H1 SEI
vincent.lhuillier@LIGO.ORG - posted 15:53, Monday 22 April 2013 (6161)
Model updates - BSCs 1 2 3 6

BSC-ISI common model was updated. I modifided the master model and a couple of MEDM screens. Changes were commited (rev 4230 for model and re 4231 for MEDM screen). 

A correction was made on the T240 calibration gain and binary outputs block was modified to control STS-2s centering proccess. Overview and BIO screens were modified as well.

New codes were installed on BSCs 1 2 3 6.

H1 SUS
betsy.weaver@LIGO.ORG - posted 15:53, Monday 22 April 2013 (6160)
BSC2 chamber closeout

Since further work continued in the chamber last week, the final chamber closeout had not been completed.  After checking for task completions for the final, final time, I went in and

1) checked for tools (none found, good)

2) removed the in-chamber stool

3) took a few more pix

4) re-inspected the naked BS optic (yep, dirty @ ~1-3 particles per square inch in many regions of both HR and AR face - some there prior to last week)

5) wiped my way out of chamber

6) placed verticle 1" witness optic under the BS suspension.

H1 PSL
michael.rodruck@LIGO.ORG - posted 15:15, Monday 22 April 2013 (6159)
PSL plots

For the 35W beam.

Images attached to this report
Non-image files attached to this report
H1 SEI
vincent.lhuillier@LIGO.ORG - posted 13:26, Monday 22 April 2013 (6157)
ISI-BSC2

The ISI-BSC2 (tested at the end of last week) is functional. The testing report can be found at LIGO-E1300292-v1.

LHO General
patrick.thomas@LIGO.ORG - posted 10:11, Monday 22 April 2013 (6156)
dust monitors in LVEA
I had to restart the IOC for the dust monitors in the LVEA due to communication errors. Cause is unknown.
H1 CDS
james.batch@LIGO.ORG - posted 09:06, Monday 22 April 2013 (6155)
Restart cdsfs1
Found cdsfs1 completely unresponsive, no display on console, no ability to log in remotely.  Powered off computer, removed and reinserted power cords, then powered back up.  After usual reboot, system came back, disk verify shows parity mismatches which are being repaired.
H1 IOO
keita.kawabe@LIGO.ORG - posted 01:19, Monday 22 April 2013 (6152)
IO work on Friday

Belated alog for Friday activity after Cheryl was gone.

A good news is that Cheryl told me that the IM alignment was not good when we (Kiwamu, Sheila and me) found in HAM1 that the IFO refl beam was clipping on Thursday. On Friday Cheryl restored IMs and Sheila couldn't see any clipping of the beam going to HAM1.

But the bad news is that PRM still has a huge offset.

I think  it is essential to establish that the beam is actually at a good ballpark position on PR2. If the beam going from the last IM to PR2 has a reasonable angle and yet PRM is using up more than 90% of DAC range for PIT offset, one can conclude that PRM has a big natural tilt (though we don't know why). OTOH if the beam is not hitting PR2 or something, we have a bigger problem.

Cheryl told us that it should be possible to see the beam in front of PR2 if we have 00 mode flash. Since she also told that the straight shot beam (through MC1bouncing on MC2 and coming through MC3) looked good, I and Sheila tried to align MC using only MC1 and MC3 without touching MC2. We didn't do a thorough job, in the end we were still off in PIT (looked as if 10, 01 and 11 were dominant, but PIT had larger order modes flashing) but got 00 once in a while, but we couldn't see anything in HAM3.

Before giving PRM to SUS, the following should be done:

  1. Align MC better. Note that the alignment offset of MC1 and MC3 are already kind of big-ish.
  2. Use CCD camera and IR viewer card to see if the beam is on PR2.
  3. Use CCD camera to see if the beam is hitting the baffle.
  4. Use laser safety glasses for 1064nm. Our "official" glasses are totally utterly incompatible with IR viewer.
H1 SUS
arnaud.pele@LIGO.ORG - posted 09:45, Monday 15 April 2013 - last comment - 12:42, Monday 29 April 2013(6081)
BeamSplitter phase 3a (pre)testing

Beamsplitter transfer functions have been running over the weekend in order to fix any issues during the day if needed.

The attached pdfs show :

  1. Comparison between last TF damping on and model
  2. Comparison between last TF damping off and model
  3. Comparison between LHO damping on/off and LLO phase 3a (feb 2013) TFs
  4. Zoomed version of 3.

Vertical degree of freedom is noisier than expected between 1.5 and 3Hz (3rd page of each pdf).

Non-image files attached to this report
Comments related to this report
arnaud.pele@LIGO.ORG - 15:10, Monday 15 April 2013 (6087)

Gerardo went into the chamber, checked the EQ stops, and nothing is apparently touching. When the chamber will be free tomorrow during the day, I will run quick DTT measurements for the vertical degree of freedom, between 1 and 3Hz and see if it's still noisy. There were no need of taking the night for full measurements since the other DOFs are fine. I let the night to Vincent for ISI tfs if needed.

arnaud.pele@LIGO.ORG - 13:44, Monday 22 April 2013 (6158)

I ran a DTT transfer function on the vertical degree of freedom of the beamsplitter this morning

New TF looks nicer than the old one from April 12th, meaning the beamsplitter is healthy and passed Phase 3a testing

Will run a full set of TF tonight, for our record.

Data of the DTT measurement has been saved in a matlab structure named :M1VtoM1V_20130422.mat under SusSVN/sus/trunk/BSFM/H1/BS/SAGM1/Data and has been commited to the svn

Non-image files attached to this comment
arnaud.pele@LIGO.ORG - 12:42, Monday 29 April 2013 (6219)

Last measurement on the beamsplitter has been taken monday night April 22nd with damping on and off, before pumping down BSC2 chamber.

One thing to notice :

Vertical degree of freedom remains noisy around 2Hz, as on April 12th, even though dtt transfer function from aLOG 6158 doesn't show any issues. It could be that when taking TF with matlab, the drive for that frequency band is not high enough. I will try with higher gains in the MATLAB_TFs.m script and see if it changes anything. 

Non-image files attached to this comment