Displaying reports 15321-15340 of 88268.Go to page Start 763 764 765 766 767 768 769 770 771 End
Reports until 10:54, Wednesday 03 January 2024
LHO VE
david.barker@LIGO.ORG - posted 10:54, Wednesday 03 January 2024 (75144)
Wed CP1 Fill

Wed Jan 03 10:06:32 2024 INFO: Fill completed in 6min 29secs

Gerardo confirmed a good fill curbside

Images attached to this report
LHO General
austin.jennings@LIGO.ORG - posted 08:03, Wednesday 03 January 2024 - last comment - 11:37, Wednesday 03 January 2024(75141)
Ops Day Shift Start

TITLE: 01/03 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 152Mpc
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 1mph Gusts, 0mph 5min avg
    Primary useism: 0.04 μm/s
    Secondary useism: 0.43 μm/s 
QUICK SUMMARY:

- H1 currently on a 16 hour lock

- Seismic activity is low, CDS/DMs ok

Comments related to this report
david.barker@LIGO.ORG - 11:35, Wednesday 03 January 2024 (75146)

Yesterday John Z restarted the BLRMS GDS monitor, the control room SEIS BLRMS FOM on nuc5 started displaying data from 9pm onwards.

david.barker@LIGO.ORG - 11:37, Wednesday 03 January 2024 (75147)

Verbal Alarms, which had been reporting leaps.py issues, started working normally yesterday afternoon. We currently don't understand the original error or why it cleared up.

LHO General
corey.gray@LIGO.ORG - posted 00:02, Wednesday 03 January 2024 (75139)
Tues EVE Ops Summary

TITLE: 01/03 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 157Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY:

Other than the one hitch related to the Leap Second, this was a fairly nice and smooth shift post-Maintenance.
LOG:

LHO General
corey.gray@LIGO.ORG - posted 20:17, Tuesday 02 January 2024 (75140)
Mid-Shift Status

Rainy night continues.  H1 has been locked for 4.25hrs (with about 45min out of observing due to the CW injection Leap Second issue).  Rode through a M4.9 EQ from Japan.

H1 CAL (CAL, CDS, INJ)
corey.gray@LIGO.ORG - posted 17:24, Tuesday 02 January 2024 - last comment - 17:31, Tuesday 02 January 2024(75136)
Continuous Wave (CW) INJ Gain Changes Dropping H1 From Observing (starting at 0037utc)

At 0037utc, H1 was bumped out of OBSERVING due to an SDF change.  The change has been this channel:

I chatted with Louis (phoned him because it is a CAL channel), but he mentions this is not an "online calibration issue", and this has to do with the Continuous Wave Injection.  It also does not appear to be guardian-related.  After chatting with Louis, since Jonathan and Erik are on-site, I just notified them about the issue.

We have currently been OUT of OBSERVING for about 40+min.

Attached is another screenshot with:

Currently, Dave, Erik, & Jonathan are investigating.

Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 17:29, Tuesday 02 January 2024 (75137)

0128:  Back to OBSERVING!  (thanks to Dave, Erik, Jonathan, and also Louis for my first chat with him).

jonathan.hanks@LIGO.ORG - 17:31, Tuesday 02 January 2024 (75138)
Dave, Erik, Jonathan,

This was caused by an expired leap second file on the h1hwinj1 machine.

It looked like the CW injection process was restarting.  After investigation we noticed that the psinject service was failing, with an error loading the leap second database file.

The solution was to update the tzdata package.  On SL7 this is "yum update tzdata".  After we did that the injection process was able to startup and run.
LHO General
corey.gray@LIGO.ORG - posted 16:54, Tuesday 02 January 2024 - last comment - 16:53, Wednesday 03 January 2024(75135)
Tues EVE Ops Transition

TITLE: 01/03 Eve Shift: 00:00-08:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 152Mpc
OUTGOING OPERATOR: Austin
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 6mph Gusts, 4mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.46 μm/s
QUICK SUMMARY:

Austin handed off an H1 nearly at NLN.  I eventually took H1 to Observe, at 0011utc, but at 0037, have been getting bumped out of OBSEVERING due to a gain change (i.e. H1:CAL-INJ_CW_GAIN) for CALINJ SDF.

Attached is the last 20+ min of these gain changes from 1.0 to 0.0 every ~1min.  Have Louis on the phone now.

Images attached to this report
Comments related to this report
corey.gray@LIGO.ORG - 16:53, Wednesday 03 January 2024 (75165)SEI

Forgot to mention that Jim chatted with me regarding the HAM3 ISI, and that if the glitching issues return, I should phone him if it is before ~8pm.  Luckily, we have not had to deal with this for our current 24+hr lock!

H1 SEI
jim.warner@LIGO.ORG - posted 16:06, Tuesday 02 January 2024 - last comment - 13:26, Wednesday 03 January 2024(75134)
HAM3 corner 2 cps satellite rack poked at to address glitching

After the glitches last night, I went to HAM3 to do the usual fixes. I powered off the corner 2 CPS, unplugged the boards in the satellite chassis at the chamber, put it all back together and powered everything back on. The CPS haven't glitched since then, so seems like maybe things are fine now. 

Comments related to this report
jim.warner@LIGO.ORG - 13:26, Wednesday 03 January 2024 (75150)

The 65-100 hz blrms are a good witness glitches for a couple hours before they started tripping the HAM3 ISI.  Attached trend shows about 5 hours before the first HAM3 trip on Monday. The top row are the raw H2 and V2 CPS in counts, the middle row is the watchdog state, and the bottom row are the 65-100hz blrms for the corner 2 and corner 3 blrms. The H2 and V2 cps start seeing glitches that don't trip the ISI about 3 hours before the first trip, these glitches don't really show up in the in the corner 3 CPS either. These glitches also don't coincide with locklosses, if the ISI doesn't trip. Under normal circumstances, these blrms are well below 10 nm, the first few glitches are up to 600 nm, but a glitch of ~1000nm causes the ISI to trip. There haven't been any glitches since I touched the CPS yesterday, so I think we are in the clear for now. 

I'm still not sure of the right way to alarm on this, but some sort of days-ish timeseries trend when ISI trips on CPS would probably be a good place to start.

Images attached to this comment
LHO General (DetChar)
austin.jennings@LIGO.ORG - posted 16:00, Tuesday 02 January 2024 (75123)
Tuesday Operator Summary

TITLE: 01/02 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Aquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY:

- Light maintanence day, mainly VAC turbo/ion pump work and a HWS card swap from the CDS team

- Ran an initial alignment after ISC went through CHECK MICH FRINGES thrice - ran without issue

Note that there was a large tow truck on site towing a car from 22:16 - 22:25 UTC. Tagging DetChar in case this shows up on their end as noise.

- Lockloss @ 23:10 - cause unknown

- H1 is currently relocking at TRANSITION FROM ETMX

LOG:                                                                                                                                                                                                                         

Start Time System Name Location Lazer_Haz Task Time End
16:06 FAC Tyler LVEA/Mids N Check 3IFO items 16:47
16:06 FAC Ken EX N Lighting 19:54
16:24 VAC Janos/Travis MY/EY N Turbo test 19:30
16:24 FAC Karen EY N Tech clean 17:30
16:25 Kim EX EX N Tech clean 17:44
16:27 FAC Randy LVEA N Checks 16:45
16:35 FAC Chris LVEA N Pest control 18:03
17:26 CDS Erik MSR N Replace HWS sensor card 21:18
17:39 PEM Mitch EX/Y N DM FAMIS task 18:19
18:16 FAC Karen/Kim LVEA N Tech clean 19:41
18:18 CDS Tony/Randy EX/Y N Deploy end station laptops 19:20
18:24 VAC Janos LVEA N Ion pump work 20:07
18:59 EPO Oli + tour LVEA N Tour 19:48
19:09 SEI Jim CR N HAM 5 TFs 19:31
19:57 CDS Tony EY/EX N Set up workstations 21:05
20:14 ISC TJ LVEA N LVEA sweep 20:30
20:19 FAC Ken/Richard FCES N Checks 20:39
23:11 CDS Tony CER N Take pictures 23:13
H1 General (CDS)
anthony.sanchez@LIGO.ORG - posted 15:42, Tuesday 02 January 2024 (75131)
CDS Laptops & Charging stations deployed at End stations

Both EY and EX now have Laptop charging stations in the garb rooms which contains 2 CDS laptops. These Laptops are actively being charged while they are plugged into the charging station. 
Note: these laptops will not let you login if the wifi is turned off at the End station so be sure to let the opperator know that you need wifi at the end station.

The Laptops at EX are:
cdsdell425
cdsdell437

The laptops are EY are :
cdsdell431
cdsdell285

Images attached to this report
H1 General (Lockloss)
austin.jennings@LIGO.ORG - posted 15:17, Tuesday 02 January 2024 (75133)
Lockloss @ 23:10

Lockloss @ 23:10, looks like DARM IN1 LSC saw the motion first - cause unknown.

Images attached to this report
LHO VE (VE)
travis.sadecki@LIGO.ORG - posted 12:49, Tuesday 02 January 2024 (75130)
MY and EY Turbo functionality test

FAMIS tasks 24918 and 24942

Procedure checklist for both stations completed.  No issues were identified at this time.

MY: Scroll pump hours: 75.5

       Turbo pump hours: 210

       Crash bearings: 100%

EY: Scroll pump hours: 73.3

       Turbo pump hours: 1277

       Crash bearings: 100%

H1 General
thomas.shaffer@LIGO.ORG - posted 12:26, Tuesday 02 January 2024 (75129)
LVEA swept

I swept the LVEA after maintenance activities completed. Everything was nominal except for the CER lights were left on.

H1 CDS
jonathan.hanks@LIGO.ORG - posted 12:09, Tuesday 02 January 2024 (75128)
Updated the x509 cert on lhocds before its expiration in a few days.
As part of maintenance I updated the x509 certificate for lhocds, it is good for another year.
LHO General
austin.jennings@LIGO.ORG - posted 12:00, Tuesday 02 January 2024 (75127)
Mid Shift Report

H1 is still down for maintanence work, but should begin relocking in the next 15 minutes.

H1 General
mitchell.robinson@LIGO.ORG - posted 10:42, Tuesday 02 January 2024 (75126)
Monthly Dust Monitor Vacuum Pump Check

Dust monitors running smoothly.

LHO VE
david.barker@LIGO.ORG - posted 10:23, Tuesday 02 January 2024 (75125)
Tue CP1 Fill

Tue Jan 02 10:06:20 2024 INFO: Fill completed in 6min 17secs

Travis confirmed a good fill curbside.

Images attached to this report
H1 CDS
david.barker@LIGO.ORG - posted 09:49, Tuesday 02 January 2024 (75124)
h1hwsmsr computer replacement

Jonathan, Erik, Dave:

Erik is replacing the failed h1hwsmsr (ITMX) V1 computer with a spare unit this morning. I have stopped the temporary HWS-ITMX IOC (started on cdsioc0 yesterday) to prevent duplication of EPICS channels. This is the cause of the EDC and SDF disconnect channel counts.

LHO General
austin.jennings@LIGO.ORG - posted 08:09, Tuesday 02 January 2024 (75122)
Ops Day Shift Start

TITLE: 01/02 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
OUTGOING OPERATOR: Tony
CURRENT ENVIRONMENT:
    SEI_ENV state: CALM
    Wind: 2mph Gusts, 1mph 5min avg
    Primary useism: 0.03 μm/s
    Secondary useism: 0.28 μm/s 
QUICK SUMMARY:

- H1 down for maintanence day, looks like a relatively light day today

- CDS/SEI/DMs ok

Displaying reports 15321-15340 of 88268.Go to page Start 763 764 765 766 767 768 769 770 771 End