Beam tube cleaning scheduled from 7:30 - 4 07:18 Cris into LVEA 07:30 Karen into LVEA 07:30 Peter into H1 PSL enclosure ~8:20 Corey to squeezer bay for 3IFO work 08:26 Sudarshan to end Y for PCAL work 08:57 Bubba and Jodi to move 3IFO parts from corner station to mid stations 08:58 Jim W. running measurements at HAM6 09:01 Filiberto to Y arm spool to remove electronics from test stand 09:05 Hugh and TJ cycling HEPI pumps 09:07 Richard to end stations 09:08 Rick, Ed and Jeff B. to H1 diode room to reset watchdogs 09:08 Betsy to LVEA west bay for 3IFO work 09:13 Daniel changing Beckhoff code 09:20 Peter transitioned LVEA to laser safe 09:21 Jim B. to LVEA to help Filiberto 09:27 Travis to LVEA west bay for 3IFO work 09:34 Jeff B. and Andres moved dust monitor in diode room off floor 09:39 Hugh and TJ done cycling HEPI pumps 09:39 Jamie restarting guardian machine 09:46 TJ to end stations to restock cables 09:46 Jim B. back 09:47 Peter K. to H1 enclosure 09:47 Rick to end Y 09:49 Elli to end stations to work on HWS cameras 09:53 Hugh to HAM1 to read HEPI load cells 10:09 Dave restarting H1 ODC master 10:10 Hugh done at HAM1 10:14 Peter and Matt done at H1 PSL 10:15 Betsy and Travis done 10:17 Keita to squeezer bay to talk with Corey 10:18 Travis and Betsy starting TFs on SRM, SR2 and SR3 10:38 Richard to squeezer bay to talk to Corey 11:03 Karen to end Y, Cris to end X 11:15 Gary and Jodi at mid X 11:27 Dave restarting end X ISC model 11:38 LN2 truck went through gate 11:51 Mayflower Metal delivering metal recycling container 11:57 Informed by Kyle that pumps are running on HAM1, HAM2 and BSC3 12:02 Peter transitioning the LVEA to laser hazard 12:12 Peter done transitioning the LVEA to laser hazard 12:20 ASC model changes done, Ryan starting on OMC, LSC, ODC master 12:24 Beckhoff end Y PLC3 EPICS invalid, Daniel restarted IOC 12:32 Karen leaving end Y 12:53 Praxair truck is ~ 15 minutes away 12:42 Corey to ISCT1 to take pictures 12:44 Jeff K. recompiling, restarting H1 OMC model for Ryan 12:52 Corey done at ISCT1 13:11 Cristina driving forklift from LSB to warehouse and staging building 13:11 Filiberto to mid Y 13:13 Rick and Sudarshan to end Y to work on PCAL 13:39 Jeff K. and Ryan resuming work on model changes for ODC 13:39 Betsy to LVEA 13:45 TJ to LVEA to hang cables in racks 13:48 Corey to squeezer bay 3IFO 13:48 Greg to LVEA to put parts on racks by HAM6 and look for filters to reuse from eligo chillers 14:10 Hugh taking HAM1 HEPI down to take safe.snap 14:14 Filiberto back from mid Y 14:19 Peter and Ed to H2 PSL enclosure to work on Livingston PMC 14:29 Travis and Betsy done running TFs 14:37 TJ done 14:57 Rick and Sudarshan done, Dave restarting models at end Y 15:07 DAQ restart 15:56 Corey out of LVEA