patrick.thomas@LIGO.ORG - posted 16:02, Tuesday 10 March 2015 (17167)
Ops Summary
Beam tube cleaning scheduled from 7:30 - 4

07:18 Cris into LVEA
07:30 Karen into LVEA
07:30 Peter into H1 PSL enclosure
~8:20 Corey to squeezer bay for 3IFO work
08:26 Sudarshan to end Y for PCAL work
08:57 Bubba and Jodi to move 3IFO parts from corner station to mid stations
08:58 Jim W. running measurements at HAM6
09:01 Filiberto to Y arm spool to remove electronics from test stand
09:05 Hugh and TJ cycling HEPI pumps
09:07 Richard to end stations
09:08 Rick, Ed and Jeff B. to H1 diode room to reset watchdogs
09:08 Betsy to LVEA west bay for 3IFO work
09:13 Daniel changing Beckhoff code
09:20 Peter transitioned LVEA to laser safe
09:21 Jim B. to LVEA to help Filiberto
09:27 Travis to LVEA west bay for 3IFO work
09:34 Jeff B. and Andres moved dust monitor in diode room off floor
09:39 Hugh and TJ done cycling HEPI pumps
09:39 Jamie restarting guardian machine
09:46 TJ to end stations to restock cables
09:46 Jim B. back
09:47 Peter K. to H1 enclosure
09:47 Rick to end Y
09:49 Elli to end stations to work on HWS cameras
09:53 Hugh to HAM1 to read HEPI load cells
10:09 Dave restarting H1 ODC master
10:10 Hugh done at HAM1
10:14 Peter and Matt done at H1 PSL
10:15 Betsy and Travis done
10:17 Keita to squeezer bay to talk with Corey
10:18 Travis and Betsy starting TFs on SRM, SR2 and SR3
10:38 Richard to squeezer bay to talk to Corey
11:03 Karen to end Y, Cris to end X
11:15 Gary and Jodi at mid X
11:27 Dave restarting end X ISC model
11:38 LN2 truck went through gate
11:51 Mayflower Metal delivering metal recycling container
11:57 Informed by Kyle that pumps are running on HAM1, HAM2 and BSC3
12:02 Peter transitioning the LVEA to laser hazard
12:12 Peter done transitioning the LVEA to laser hazard
12:20 ASC model changes done, Ryan starting on OMC, LSC, ODC master
12:24 Beckhoff end Y PLC3 EPICS invalid, Daniel restarted IOC
12:32 Karen leaving end Y
12:53 Praxair truck is ~ 15 minutes away
12:42 Corey to ISCT1 to take pictures
12:44 Jeff K. recompiling, restarting H1 OMC model for Ryan
12:52 Corey done at ISCT1
13:11 Cristina driving forklift from LSB to warehouse and staging building
13:11 Filiberto to mid Y
13:13 Rick and Sudarshan to end Y to work on PCAL
13:39 Jeff K. and Ryan resuming work on model changes for ODC
13:39 Betsy to LVEA
13:45 TJ to LVEA to hang cables in racks
13:48 Corey to squeezer bay 3IFO
13:48 Greg to LVEA to put parts on racks by HAM6 and look for filters to reuse from eligo chillers
14:10 Hugh taking HAM1 HEPI down to take safe.snap
14:14 Filiberto back from mid Y
14:19 Peter and Ed to H2 PSL enclosure to work on Livingston PMC
14:29 Travis and Betsy done running TFs
14:37 TJ done
14:57 Rick and Sudarshan done, Dave restarting models at end Y
15:07 DAQ restart
15:56 Corey out of LVEA