TITLE: 06/25 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Patrick
SHIFT SUMMARY:
LOG:
Last Lock: 25:43:33
10:05 Begin IA
10:30 Begin locking
12:01 H1 back to Observing
14:46 PEM Weekly script running - Intention bit Commissioning
14:50 Chris and Jeff B moving lift trucks
14:51 Chandra and Kyle heading out to MY - gate valves
14:57 Sensor correction turned off and H1 in Preventive maintenance mode