Reports until 16:12, Friday 20 September 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:12, Friday 20 September 2019 (52042)
Ops Day Shift Summary
TITLE: 09/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 110Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Remained locked entire shift. Dropped out of observing a couple of times for PEM injections and measurements.
LOG:

15:03 - 15:16 UTC Niko to optics lab
H0:FMC-MX_AH_COOLTEMP_2_DEGF invalid alarm
16:09 UTC H0:FMC-MX_AH_COOLTEMP_1_DEGF invalid alarm
H0:FMC-MX_AH_DSCHRG_DEGF invalid alarm
17:20 - 18:25 UTC Dropped out of observing for PEM injections. Robert and team to LVEA.
17:30 - 18:03 UTC Tyler moving bee nest with forklift
18:01 - 18:20 UTC Chandra to mid X
18:56 UTC Dripta to optics lab
19:07 UTC Ethan to optics lab
19:30 UTC Ethan and Dripta out of optics lab
20:20 - 20:33 UTC Gerardo to mid X
21:04 UTC Switched to commissioning for Sheila to run measurements
21:34 - 21:55 UTC Robert and team to LVEA to set up accelerometers
22:26 UTC Robert to LVEA
22:31 - 22:57 UTC Kyle to mid stations
22:32 UTC Back to observing
22:52 - 23:02 UTC Dripta to optics lab