Reports until 16:06, Saturday 21 September 2019
LHO General
patrick.thomas@LIGO.ORG - posted 16:06, Saturday 21 September 2019 (52059)
Ops Day Shift Summary
TITLE: 09/21 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 109Mpc
INCOMING OPERATOR: Corey
SHIFT SUMMARY: Remained locked and observing entire shift. No issues. Bee keeper came to take hives.
LOG:

15:42 UTC SEI_CONF to WINDY
16:37 UTC Bee keeper through gate to retrieve bee hives
16:46 UTC GRB-Short (E351160) 590777160 TRIGGER_DUR:     1.024 [sec] Stand down
16:52 UTC Set INJ_TRANS to INJECT_KILL
17:31 UTC Ethan to optics lab
17:32 UTC Set INJ_TRANS to INJECT_SUCCESS
20:00 UTC SEI_CONF to EARTH_QUAKE for eq from Timor-Leste
21:37 UTC SEI_CONF to WINDY