TITLE: 09/21 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Observing at 19Mpc
OUTGOING OPERATOR: Patrick
CURRENT ENVIRONMENT:
SEI_CONF state: WINDY
Wind: 11mph Gusts, 9mph 5min avg
Primary useism: 0.03 μm/s
Secondary useism: 0.32 μm/s
Microseism is making a slight downward trend after its step up 22hrs ago.
QUICK SUMMARY:
- H1's been locked/observing for 16.25hrs. Had a short recent triple-coincident stretch, but lost L1---they are battling the environment & EY HVAC.
- Continue to have Guardian Message for SZQ Manager node regarding the railed green power stabilization (ops are to ignore this).
- While going through the checksheet, noticed an error for the external Mech Room door at EY (probably the usual comms error); cleared by cycling a "Force" on it.