TITLE: 11/07 Day Shift: 16:00-00:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Jim
SHIFT SUMMARY:
LOG:
17:10 Vlad out to Optics Lab
17:20 Brian O'Reilly from Livingston called about an event from yesterday
17:47 Superevent S191105e (repeat from yesterday) was recieved. Brian O'Reilly called with the "heads up". THe Phone call came in as well.
18:47 Dan Brown out to OpticsLab
21:00 H1 out of Observing for Commissioning in conjunction with LLO.
15:45 H1 will remain in commissioning until ~16:00