Reports until 16:07, Friday 26 April 2024
LHO General
ryan.short@LIGO.ORG - posted 16:07, Friday 26 April 2024 (77450)
Ops Day Shift Summary

TITLE: 04/26 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: Commissioning for most of the morning which ended in a lockloss. Relocked easily and have been observing for the afternoon.

LOG:

Start Time System Name Location Lazer_Haz Task Time End
15:48 SQZ Terry, Kar Meng Opt Lab Local SHG work 16:52
16:04 PEM Robert LVEA, EX - Pack up equipment 17:52
17:46 VAC Janos EX - CP dewar jacket pumping 18:39
17:52 SQZ Terry, Kar Meng Opt Lab Local SHG work 20:17
18:49 PEM Robert EX - Shutting down PEM setup 19:38
20:21 PEM Robert CER - Retreive cable 20:32
21:36 SQZ Terry, Kar Meng Opt Lab Local SHG work 23:36