TITLE: 04/27 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 150Mpc
INCOMING OPERATOR: Tony
SHIFT SUMMARY: One lockloss and an earthquake this shift, but otherwise a quiet one. Since neither H1 nor L1 were locked for the scheduled 18:30 UTC coordinated calibration sweeps, we have postponed them until tomorrow at the same time.
H1 has now been locked for 4 hours.
LOG:
Start Time | System | Name | Location | Lazer_Haz | Task | Time End |
---|---|---|---|---|---|---|
17:19 | PEM | Robert | EX | - | Picking up cables | 17:37 |