14:30 Peter K to PSL RI to check signals 14:40 Chris S to LVEA for maintenance items 14:45 Peter out 15:09 Kyle, Chandra out to LVEA to work on RGA (WP#6111) 15:14 Jeff B to ends for dust monitor flow tests (WP#6107) 15:16 Chris, Joe opening inner high bay roll up. 15:33 Fil, Ed M to ends to pull beckhoff chassis and to pull cables. 15:36 Peter, Jason to PSL to replace HPO power meter (WP#6112) 15:46 Joe out 15:50 Marc to LVEA to inspect OMC DCPD AA chassis (WP#6116) 15:58 Betsy to LVEA taking out bins 16:02 Jeff B done at ends moving to mech room and then LVEA 16:08 Johnathan starting work on fw0 16:38 Kyle, Chandra out 16:40 Patrick, Fil to ends 16:43 Marc, Chris W to LVEA to work on (WP#6104) 16:50 Keita and guest to LVEA tour 16:55 Gerardo to LVEA to terminate cables 16:55 Christina to EY then MY 17:10 Mike with PNNL tour into LVEA 17:24 Patrick, Fil back 17:33 Betsy, Bubba to LVEA 17:36 Ed, Elizabeth leaving EY to EX 17:37 Marc, Chris W out 17:46 Kyle out 18:04 Mike and tour out 18:07 Betsy, Bubba out 18:16 Christina EX -> MX 18:45 Kyle to LVEA then out in a few minutes 18:52 Christina leaving MX 18:55 Marc, Chris W to LVEA 18:58 Ed, Elizabeth back from ends 19:07 Chris W out 19:29 Gerardo out 19:29 Marc, Elizabeth to CER 19:29 Jason, Peter out. 19:40 Marc, Elizabeth out 19:40 Fil back 19:50 Fil, Gerardo to LVEA to fix power cables 20:00 Daniel, Jenne, Chris to LVEA to look for issue with IMC 20:32 Gerardo, Chandra to LVEA to fix PT140B 20:46 Gerardo, Chandra out 20:59 Sheila, Jenne, Chris to LVEA to look for issue with IMC 21:09 Marc joining the crew for IMC 21:09 Marc joining the crew for IMC 21:30 IMC crew out 21:54 Marc out 22:32 Richard, Fil to LVEA joining the IMC fight.