All times in UTC. 16:01 Took IFO down to start maintenance day. 16:07 Bubba and Ken to EY 16:23 Hugh to EY for seismo swap 16:31 Kris and Cristina to both ends 16:32 Richard plugging in LVEA WAPs, Fil to EY 16:42 Jason to remove beam dumps on TCS tables 16:57 Fire dept. to MX, then EX, then EY 17:08 ChrisS to MY 17:17 Jason done with TCS, taking ISS offline for diode tuneup 17:31 Karen leaving EY 17:33 HAM2 model check by DaveB 17:39 Sheila, Heather, Vaishali to EX for power monitor 17:50 Hugh to LVEA for seismo deploy, Cristina leaving EX 17:53 Jason done 18:15 Richard and Fil done 18:17 ChrisS done at MY, going to MX 18:23 Norco N2 delivery 18:24 Fil and Richard to LVEA for interlock work 18:35 DaveB to both ends for label checks 18:59 ChrisS done at mids, moving snorkel lift 19:03 Corey to squeezer bay on a parts hunt 19:19 Corey out 19:42 Richard out 20:02 Ken back 20:11 DaveB done 20:58 Richard and Fil out 22:18 Jenne adjusted the ISS diffracted power via the instructions found in the alog linked from the ISS MEDM screen (alog 31262) LVEA was swept and transitioned to laser SAFE by Patrick. I ran the wap_scan and flir_scan script and confirmed that everything was OFF.