1500 Karen to EY 1532 Hugh, Jim to HAM6 to troubleshoot CPS 1549 Karen from EY to MY 1558 Fil to LVEA to start illuminator work 1600 Norco at gate for tank #75 1609 Jason, Ed to PSL 1623 Travis, Betsy to EX for clean up 1635 Karen done at MY 1636 APS to EX and MX 1640 Keita, Marc, Nolan to LVEA for RF leakage measurements in ISC racks 1700 Peter, Rick to PSL for FSS work 1703 Jim to EX to rebalance the BRSX 1713 Hugh to LVEA 1717 Patrick to LVEA 1718 Hugh out 1740 TVo, Gabrielle out 1740 Jason out 1749 Jason going back in 1830 Jason out 1811 Robert to PSL 1819 Hugh to HAM6 area 1820 Robert not going in 1822 Hugh back 1831 Keita, Marc, Nolan out 1830 Travis, Betsy back 1838 Richard to chiller yard at EY 1900 SUS model changes and DAQ restart 1950 Travis to EX, then MX 2010 Travis backl 2032 Fil out 2040 Peter, Rick out 2043 Jason to LVEA to center BS OpLev 2047 Gerardo to EX 2048 Keita, Nolan to LVEA to do balun measurement 2048 Jason out 2101 Fil, Ed to LVEA to check on illuminators 2106 Marc to MY 2108 Keita, Nolan done 2133 Marc back 2143 Gerardo back 2150 Richard to LVEA for access control 2201 Fil, Ed out 2219 Richard out 2224 Robert to PSL