13:41 Peter into PSL enclosure 14:53 Rick to PSL 15:20 Hugh to CER 15:23 Nutsinee to SQZT6 15:31 Chandra to LVEA 15:36 Fil to HAM4 RF cable investigation 15:36 Mark and Tyler to LVEA installing ion pump 15:39 Ed to LVEA cable pulling 15:46 Chris to LVEA 15:47 Karen to MY and EY 15:49 Jason to EY retreiving HeNe OpLev laser 16:01 JeffB to LVEA and PSL for chiller work 16:05 Ed out 16:19 Jason back 16:23 Nutsinee to ISCT6 16:25 Jason to PSL 16:33 Phillipe and Kara to LVEA 16:33 Fil out 16:41 T Vo to LVEA closing PSL lightpipe shutter and prepping for CO2 table work 16:44 Vanessa to LVEA 17:06 Dan and TJ to EY for HWS work 17:23 Chandra to LVEA 17:38 Cheryl to PSL 17:41 T Vo running excitation on ITMy 17:49 Hugh to LVEA looking for rigging 17:57 Hugh out 17:58 Gabriele to EY 18:08 Fil to both ends checking PEM equipment 18:12 Georgia to EY HWS help 18:23 Mark, Tyler, Chris done installing ion pump 18:29 JeffB out 18:50 Hugh to CER 18:51 Dick to ISC racks in LVEA for RF investigations 18:53 Hugh out 19:20 Cheryl out 19:34 HWS team back for lunch 19:54 Ed, Phillipe, and Kara out 19:55 Fil to both ends for PEM work 20:26 Jason to PSL 20:27 Mark and Chris to EY to investigate bats 20:31 Phillipe to LVEA 20:34 Team HWS to EY 20:36 Ed to LVEA 20:41 Marc and Dick out 20:48 Cheryl to PSL 21:14 Kara and Phillipe to LVEA 22:03 Gabriele to EY 22:04 Team HWS done 22:09 Rick out 22:10 Peter out 22:58 Gabriele back