TITLE: 10/02 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Commissioning INCOMING OPERATOR: None SHIFT SUMMARY: Peter transitioning LVEA to LASER SAFE 14:35 (7:35) Crack sealers on site 14:38 (7:38) Jeff to TCSX Table -- work on leak 14:40 (7:40) Nichole, Christina to LVEA 15:00 (8:00) Start of shift 15:03 (8:03) Karen leaving EY, going to EX 15:16 (8:16) Chris, pest control to LVEA 15:19 (8:19) Karen leaving EX 15:21 (8:21) TJ to mezzanine -- start TCSX chiller 15:30 (8:30) Chris, pest control out of LVEA, going to EY, EX 15:35 (8:35) Peter, Richard to EX -- ALS fiber cleaning 15:40 (8:40) Marc to LVEA -- Beckhoff hardware investigation 15:42 (8:42) Fil to EX -- power supply swap (high voltage off until ~10:30) 15:48 (8:48) Karen to Optics Lab, then LVEA 15:58 (8:58) Betsy to LVEA -- catch up with Nichole and Christina 16:00 (9:00) TJ to LVEA -- TCSX table work 16:08 (9:08) Rick, Travis to EX -- PCal laser tuneup 16:10 (9:10) Dick to LVEA -- noise chasing 16:13 (9:13) Peter, Richard back from EX 16:13 (9:13) Richard to LVEA -- cable swap 16:16 (9:16) Rick transitioning EX to LASER HAZARD 16:17 (9:17) Richard back from EX 16:17 (9:17) Gerardo to MX -- annulus ion pump replacement 16:22 (9:22) Chris, pest control back from End Stations 16:27 (9:27) TJ, Jeff, Jason to LVEA -- TCSX leak work 16:40 (9:40) Port-o-potty cleaners entering site 16:57 (9:57) Chris to LVEA -- help Christina and Nichole 17:15 (10:15) Karen out of LVEA/optics lab 17:16 (10:16) Norco truck entering site 17:26 (10:26) TJ, Jason, Jeff out of LVEA 17:28 (10:28) Rick back from EX, then back to EX 17:36 (10:36) Jeff to Optics Lab -- check dust monitors 17:41 (10:41) Cintas entering site 17:56 (10:56) Jeff back from Optics Lab, moving to Diode Room 18:01 (11:01) Jeff back from Diode Room 18:18 (11:18) Jeff to EX, EY -- check dust monitors 18:21 (11:21) Richard, Peter to LVEA -- look at access for PSL 18:27 (11:27) Richard, Peter out of LVEA 18:51 (11:51) TJ to LVEA -- transition to LASER HAZARD, check TCSX table 19:02 (12:02) Jeff to Diode Room -- check dust monitor 19:13 (12:13) Sheila, Terry, Haocun to ISCT6 19:13 (12:13) Fil, Ed back from EX -- high voltage powered on again 19:14 (12:14) Jeff back from Diode Room 19:17 (12:17) TJ back from LVEA 19:25 (12:25) Nutsinee to ISCT6 19:31 (12:31) Chandra, Kyle done in LVEA 19:32 (12:32) Gerardo back from MX 20:28 (13:28) Rick, Travis leaving EX 20:31 (13:31) Sheila, Terry, Nutsinee, Haocun out of LVEA 21:08 (14:08) Marc to LVEA -- take down serial numbers 21:18 (14:18) Marc back from LVEA 22:36 (15:36) Gerardo to MX -- continue pump replacement 22:58 (15:58) Sheila, Terry, Haocun, Nutsinee to ISCT6 23:00 (16:00) End of shift