1424 Chris to OSB receiving to stage scaffolding 1435 Chris done 1505 Jeff B to LVEA to start TCSX flow meter swap 1529 Terry to LVEA to start ISCT6 AM work 1530 Karen to EY 1532 Fil, Ed to EY to start electronics work 1534 Chris starting tumbleweed clearing on inside Xarm 1541 Karen leaving EY 1545 Jason to PSL enclosure 1549 Fil turning off HV at EY 1558 Cheryl to PSL 1559 Karen to LVEA 1608 Jim to EX to work on BRS 1631 Chandra and guests to LVEA 1640 Jim back 1645 Amber and film crew ot LVEA 1705 Vanessa to EX 1713 Jeff K restarting CALCS model 1714 Christina moving pallets from water tank area to LSB 1715 Jim to LVEA to look at HAM5 1716 HV at EY going back on 1720 Rick and Mike Z to LVEA 1726 Amber and crew out 1726 Beckhoff restart 1733 Chris done 1738 Chandra out, dropped off guests and then back into LVEA 1743 Chris taking the snorkel lift from water tank to staging building 1759 Fil/Ed at EX now 1838 Jim has been back 1902 Fil and Ed back 1917 Chandra and Mike Z out 1921 Jason and Cheryl out 1945 Fil to EY to pull a chassis 2021 Fil back 2114 Sheila to LVEA to adjust the OSA 2119 Sheila back 2145 Nutsinee to LVEA to ISCT6