Jim, Corey, Hugo
The shipment #3759 from LLO contained:
They were all huddle tested, and validated. Spectra are attached.
3 of these 5 hortizontal GS13s were installed on HAM-ISI Unit #5, to replace the non-validated testing pods (aLog #2843)
The vertical GS13s will be installed on HAM-ISI Unit #6 which is currently being assembled.