Reports until 02:13, Wednesday 07 June 2017
LHO VE
kyle.ryan@LIGO.ORG - posted 02:13, Wednesday 07 June 2017 - last comment - 09:35, Wednesday 07 June 2017(36688)
Unexpected pressure rise at Y-mid
 

I checked the Vacuum Site Overview MEDM screen and saw the telltale rise in pressure at the Y-mid station that is consistent with a warming 80K cyrogenic pump,  I investigated and found that IP9 had tripped off so I restarted it.  Only one of the two channels restarted.  The other channel is inop.  While on site I overfilled CP4 by opening the LLCV manual bypass valve 1/2 turn.  LN2 was observed at the exhaust outlet in a total of 38 minutes.  


Non-image files attached to this report
Comments related to this report
kyle.ryan@LIGO.ORG - 02:31, Wednesday 07 June 2017 (36689)


		
		
kyle.ryan@LIGO.ORG - 03:46, Wednesday 07 June 2017 (36690)
C
Leaving UHP GN2 regulator output set at 40 psig and flow limitied to 2 LPM. 

0355 hrs. local -> Kyle leaving site (this time for real).  Cheryl V. in CR

chandra.romel@LIGO.ORG - 07:40, Wednesday 07 June 2017 (36696)VE

Thank you, Kyle and Gerardo, for responding. Tagging VE.

gerardo.moreno@LIGO.ORG - 09:35, Wednesday 07 June 2017 (36701)VE

Remote logged in at around 7:00 utc, determined that IP9 had tripped, notified Kyle who was already manually filling CP4 (first time).

At the same time I noticed that I had not fully restored CP4 fill control screen and the power for LLCV was still disabled (which is very easy to miss), at this time I enabled the power and restored all values, this screen was not restored due to a wrong burtrestore file, see Patrick's earlier aLOG