Reports until 09:26, Tuesday 21 November 2017
H1 PSL
jason.oberling@LIGO.ORG - posted 09:26, Tuesday 21 November 2017 - last comment - 09:35, Tuesday 21 November 2017(39495)
PSL Weekly FAMIS Tasks (FAMIS 3920 & 8449)

This morning I completed the weekly PSL FAMIS tasks.

HPO Pump Diode Current Adjust (FAMIS 8449)

With the ISS OFF, I adjusted the operating current of the HPO DBs.  The changes are summarized in the below table and a screenshot of the PSL Beckhoff main screen is attached for future reference.

  Operating Current (A)
Old New
DB1 51.9 52.3
DB2 54.1 54.5
DB3 54.1 54.5
DB4 54.1 54.5

This is a large increase for just one week of operation, which can be an indication of a DB nearing the end of its life (remember that DB2, DB3, and DB4 are still the original DBs installed when the H1 PSL was in late 2011/early 2012).  We will keep an eye on this.

I did not adjust the operating temps of the DBs.  The HPO is outputting ~154.0 W and the ISS is back ON.  This completes FAMIS 8449.

PSL Power Watchdog Reset (FAMIS 3920)

I reset both PSL power watchdogs at 17:18 UTC (9:18 PST).  This completes FAMIS 3920.

Images attached to this report
Comments related to this report
jason.oberling@LIGO.ORG - 09:35, Tuesday 21 November 2017 (39496)

Attached is a trend of the operating current of the HPO DBs.  The uptick in the current increase can be seen in all DBs over the last few weeks.

Images attached to this comment
Non-image files attached to this comment